BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in Wheeling, West Virginia. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Award Details Contract Award Date: Aug 26, 2022 Contract Award Number: W911WN22P8006 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: N2AEKDDV3376 Contractor Awarded Name: ADVANCED LOGISTIC PARTNERS INC Contractor Awarded Address: Jarrettsville, MD 21084-1634 USA Base and All Options Value (Total Contract Value): $214220.00 AWARD The Government will issue a single Purchase Order resulting from this Solicitation to the lowest priced quote conforming to the solicitation. This project is set-aside 100% for Small Business. NAICS Code 562991 Septic Tank Related Services. The Small Business Size Standard for this NAICS is $8M. 00 21 00 - 04 ESTIMATED COST OF THE WORK Disclosure of Magnitude of Construction (FAR 36.204 and DFARS 236.204) The estimated cost of the proposed work is between $100,000 and $250,000. 00 21 00 - 05 LOCATION AND DESCRIPTION OF WORK Location: The work is located at the 3709 Warwood Ave., Wheeling, West Virginia 26003-9776, in Ohio County. Description of Work: Contractor shall rehabilitate the existing sewage pump station to include the submersible pumps, motors, motor controls, portions of the discharge piping and all associated pump station hardware exposed to the untreated sewage. The existing concrete sump vault and valve pit will be reused. 00 21 00 - 06 ACCESS TO SITE The site of the work may be reached from state highways and local roads and streets. 00 21 00 - 07 MINIMUM RATES The wage rates specified in these specifications represent the minimum rates to be paid on the work and are not intended to represent the actual rates that the Contractor may have to pay. The Government does not guarantee that a sufficient supply of qualified labor can be obtained at the minimum rates specified. 00 21 00 - 08 QUOTE SUBMISSION METHOD OF SUBMISSION. Offerors shall submit one (1) electronic copy of their Quote via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module before the time and date specified in Block 10 of this Request For Quotations, SF 18. SUBMISSION OF QUESTIONS Due to the importance of maintaining the schedule for this project, it is requested that all questions regarding this solicitation be submitted by 11:00 AM ET five (5) days prior to the quote due date identified in Block 10 of the SF18. All questions must be in writing and shall be emailed to: Erica.L.Mullen@usace.army.mil and LRP.CONTRACTING@USACE.ARMY.MIL with the SUBJECT identified as "W911WN22Q8009 - QUESTIONS." Any questions received after the above deadline are at the discretion of the Contracting Officer. Requests for hardcopies of the solicitation, any solicitation attachments and amendments (if applicable) will not be W911WN22Q8009 Page 6 of 38 honored W911WN22Q8009 Page 4 of 38 Section 00 21 00 - Instructions CLAUSES INCORPORATED BY REFERENCE 52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.217-5 Evaluation Of Options JUL 1990 CLAUSES INCORPORATED BY FULL TEXT 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation. (2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer. (b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer. (2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work. (End of provision) 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) (a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed. (b) Site visits may be arranged during normal duty hours by contacting: Dale Hastings 3709 Warwood Ave., Wheeling, West Virginia 26003-9776 (304) 277-2127 The US Army Corps of Engineers, Pittsburgh District, has a requirement to rehabilitate the existing sewage pump station at Pike Island Locks and Dam, Ohio County, West Virginia. This requirement is to rehabilitate the existing sewage pump station to include replacement of the submersible pumps, motors, motor controls, portions of the discharge piping and all associated pump station hardware exposed to the untreated sewage. The existing concrete sump vault and valve pit will be reused. In general, the tasks required in the performance of this contract include: Secure and pump out the vault, dispose of the pumped waste. Clean and sanitize the vault interior in preparation for equipment replacement. Remove existing sewage pumps, supply and install two (2) new vertical electric submersible grinder pump/motor units in accordance with these specifications. Remove the existing 4 diameter discharge pipe from each pump discharge up to and including the discharge check valve and replace the piping in kind in accordance with these specifications. Piping to be supplied by the Contractor. Remove existing pump guide rails and lifting chains and provide and install new stainless steel pump guides and stainless lifting steel chains. Remove existing electrical components and hardware to include the dual pump motor controller, all cable in the vault, all junction boxes, watertight fittings and vault seal-off penetrations, all float switch and alarm actuators located in the vault, and all mounting hardware. Replace all items removed with all new contractor supplied electrical components and stainless steel brackets and mounting hardware. Test the completed system. The RFQ Package contains the solicitation and (9) Attachments. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtmlsolNo=W911WN22Q8009' to obtain more details.* *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$214,220.00

Public - Federal

Renovation, Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
61
Bidding Soon
948
All Active Projects
319
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2022

August 24, 2022

img_map_placeholder

3709 Warwood Ave, Wheeling, WV


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.