BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a power facility in Bridgeport, Washington. Working plans call for the renovation of a power facility.

A SITE VISIT is tentatively scheduled for 22 August 2024 at 9:00 AM PDT at Chief Joseph Dam, Bridgeport, WA 98813. In order to attend the site visit, all interested offerors MUST submit the "Site Visit Security Information - Request for Attendance" form attached to this announcement. Due to the time required to process, all interested offerors must submit the form no later than 12:00 PM PDT on 23 July 2024. Late respondents, those not pre-registered, or those not providing the correct information will not be granted access to the site. Participation is limited to two representatives from each interested entity. Site visit date may be subject to change. POINT-OF-CONTACT: The point-of-contact for administrative or contractual questions is Londres Medranda at email: londres.medranda@usace.army.mil. No phone calls will be accepted. All questions must be submitted in writing to the above point-of-contact. FOR INFORMATION ONLY: This Synopsis/Pre-Solicitation Notice is ONLY A NOTIFICATION that a solicitation is anticipated and forthcoming. All questions regarding this Synopsis/Pre-Solicitation should be submitted in writing via email to Londres Medranda at the email indicated above. OVERVIEW: This is a combination of replacement and refurbishment of the isolated phase buses that support generating units 1-16 at the Chief Joseph Dam (CJD) in Bridgeport, WA. The scope of this Contract covers the following: 1. Replacement of outdoor sections of the isolated phase bus. The 7000A sections of the bus for Transformer Banks T1 will be replaced with 8000A sections. The work must include: a. Demolition of all existing bus work b. Installation of new bus work c. Perform all associated field-testing including torque hardware, digital low resistance measurements at each connection, and hi-pot testing 2. Replacement of outdoor sections of the isolated phase bus. The 4000 amperes outdoor sections for T1-T4 will be replaced with 4500 amperes sections. The work must include: a. Demolition of all existing bus work b. Demolition of all existing steel supports c. Installation of new bus work including new supporting structure d. Perform all associated field-testing including torque hardware, digital low resistance measurements at each connection, and hi-pot testing e. Provide new transformer compartments designed with removable covers and low point drains f. Provide new flexible bellows g. Provide new wall seal assemblies and through-bushings 3. Refurbishment of the iso-phase bus for Units 1-16, not replaced under this contract. The work must include: a. Cleaning and testing of all insulators b. Replacement of damaged insulators; if any insulators show signs of voltage tracking, determine the cause of tracking, correct the cause of tracking and replace all insulators showing tracking. c. Replacement of all gaskets and bellows d. Replacement of all steel isolation material between bus housing and support e. Replacement of all seal-off bushings f. Complete cleaning of the bus and the inside and outside of the bus housing g. Replacement of adapter bars as required h. Replacement of flexible links i. Splice locations disassembly, check silver plate and re-silver the plate, re-assemble j. Perform all associated field-testing including torque hardware, digital low resistance measurements at each connection, and hi-pot testing k. Bring bus support system up to current seismic standards, either by replacing supports with new or analyzing existing supports and rehabilitating as necessary. This includes steel supports and associated concrete anchors. l. Touch up with paint all areas that need to be repainted. 4. Provide the iso-phase bus manufacturer's field engineering services on site to oversee installation of the new iso-phase bus. 5. Provide as-constructed contract drawings and as-constructed shop drawings, as indicated. 6. Provide Operations and Maintenance instructions on the new iso-phase bus. The magnitude of construction is estimated to be between $10,000,000 and $25,000,000. The resulting contract will be Firm Fixed-Price. Solicitation number W912DW24R0027 will be posted to the System for Award Management (SAM) website (https://sam.gov) on or about 26 July 2024. The Government intends to solicit this requirement as a Request for Proposal (RFP). See the solicitation for details about proposal submission. The NAICS code for this procurement is 237990 Other Heavy and Civil Engineering Construction, and the associated small business size standard is $45,000,000 in average annual receipts. The solicitation will be issued as full and open competition. The estimated contract period of performance is approximately 1,100 calendar days. The solicitation documents for this requirement will be issued in electronic format only and will be made available online via the SAM website at https://sam.gov and the Procurement Integrated Enterprise Environment (PIEE) website at https://piee.eb.mil under the subject solicitation number. NO CD's OR HARD COPIES WILL BE AVAILABLE. Offerors are responsible for checking for any update(s) to the Notice/Solicitation. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the document(s) posted at the referenced website. To obtain automatic notifications of updates to this notice, you must log in to https://sam.gov and add the solicitation to your watchlist. If you would like to list your firm so others can see you are an interested vendor, you must click the Add Me To Interested Vendors button in the listing for this solicitation on the SAM website. The SAM Response Date listed elsewhere in this synopsis is for SAM archive purposes only. It may have no relationship to the actual solicitation due date. The solicitation due date and time will be contained in the solicitation and any solicitation amendments that are issued. IMPORTANT NOTICE: All contractors proposing on Department of Defense (DoD) solicitations must be registered in the System for Award Management (SAM) database prior to award of a contract. The purpose of this database is to provide basic business information and capabilities to the Government. The SAM website can be accessed at https://sam.gov. Contractors are encouraged to register as soon as possible. All new contracts can be made ONLY to contractors who are registered in SAM. This requirement applies to all DoD contract awards. The Method of Contractor Selection has not been determined at this Time.

Final Planning

Hydroelectric Power Generation

$25,000,000.00

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
9
Bidding Soon
266
All Active Projects
78
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 6, 2024

img_map_placeholder

To Be Determined, Bridgeport, WA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.