Site work and renovation of a civil project in Port Richey, Florida. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
As of 08/01/22 Addendum 1 and 2 are available. Contact owner for more information! Pasco County is looking for a general contract to provide the following: 1. At the Jasmine Lakes community, installation of a new sewer conveyance and pumping system, including a new duplex lift station, 710 linear feet of 6-inch diameter PVC force main piping, and 470 linear feet of 8-inch diameter PVC force main piping by open cut methods. The force main piping work requires the removal of abandoned utility piping, including 900 linear feet of 12-inch diameter PVC piping and 800 linear feet of 8-inch diameter asbestos cement piping. Upon completion and activation of the new pumping system, the existing wastewater treatment facility shall be abandoned, demolished and disposal of debris. The work shall also include installation of a new primary and secondary potable water connection for the community, including 690 linear feet of 8-inch diameter PVC water main piping by open cut methods and two (2) aboveground meter and control valve assemblies. 2. At the Palm Terrace community, installation of a new gravity sewer collection and pumping system, including 250 linear feet of gravity sewer piping, four (4) manholes, a Page 2 of 5 new duplex lift station, 1,710 linear feet of 6-inch diameter PVC force main piping by open cut methods, and 2,140 linear feet of 6-inch diameter HDPE force main piping by horizontal directional drilling methods along Ranch Road, with three (3) separate drill lengths. Upon completion and activation of the new pumping system, the existing wastewater treatment facility shall be abandoned, demolished and disposal of debris. The work shall also include installation of a new secondary potable water connection for the community, including 140 linear feet of 6-inch diameter PVC water main piping and an aboveground meter and control valve assembly. 3. At the Zephyr Shores community, installation of a new primary and secondary potable water connection for the community, including 200 linear feet of 6-inch diameter PVC water main piping, 120 linear feet of 8-inch diameter PVC water main piping, 50 linear feet of 16-inch diameter steel casing by jacking and boring methods, an aboveground meter and backflow prevention assembly, and an aboveground meter and control valve assembly. 4. Complete restoration of the existing surface materials, including asphalt and concrete repairs, and sodding of the impacted right-of-way along the route. Question Acceptance Deadline 07/18/2022 02:00 PM EDT Questions are submitted online No General Requirements - Insurance Required - Bid Bond 5 % The Contractor shall provide equipment which will be efficient, appropriate and large enough to secure a satisfactory quality of work and a rate of progress that will insure the completion of the work within the time stipulated. If at any time such facilities appear to the Engineer to be inefficient, inappropriate, or insufficient for securing the quality of work required or for producing the rate of progress aforesaid, the Engineer may order the Contractor to increase the facilities equipment, and the Contractor shall conform to such order. Failure of the Engineer to give such order shall in no way relieve the Contractor of its obligations to secure the quality of the work and rate of progress required.
Post-Bid
Water / Sewer
$2,000,000.00
Public - County
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 2, 2022
October 3, 2022
Multiple Locations, Port Richey, FL
Related To This Project
Port Richey, FL
Bid Date: Mar 11 2022
Port Richey, FL
--
Port Richey, FL
Bid Date: Nov 24 2022
Port Richey, FL
Bid Date: Feb 10 2023
Port Richey, FL
Bid Date: Apr 20 2023
Port Richey, FL
Bid Date: Apr 07 2023
Port Richey, FL
Bid Date: Jul 25 2022
Port Richey, FL
Bid Date: Jul 05 2022
Port Richey, FL
--
Port Richey, FL
Bid Date: Dec 19 2018
Port Richey, FL
Bid Date: Apr 26 2022
Port Richey, FL
Bid Date: Aug 21 2019
Port Richey, FL
Bid Date: Jul 09 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.