Site work and renovation of a civil project in Gloucester Township, New Jersey. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Project consists of interceptor and manhole replacements to the West Collingswood Interceptor, a manhole rehabilitation in the Berlin Interceptor, replacement of the sloped masonry roofs at the Gloucester City and Cooper River Pump Stations, and relocation of stockpiles of soil to the CCMUAaEUR(TM)s Winslow percolation ponds. The West Collingswood work includes construction of a pipe and manhole network to replace several damaged West Collingswood Interceptor gravity manholes, including two (2) new manholes, pipe replacement, and abandonment in place of the old pipes and manholes. The Berlin Interceptor work includes the rehabilitation of a Berlin Interceptor gravity manhole including cleaning and surface preparation, crack and spall repair, if and where directed, and installation of the cured-in-place manhole liner. The roof replacement work includes demolition and removal of the existing masonry roof and installation of a new seam metal roof. The soil relocation work includes loading and transporting two (2) stockpiles of soil, one located at the CCMUA Cross Keys Pump Station and the other at the CCMUA Winslow percolation ponds, and placing the soil within the existing percolation ponds. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, as indicated in the Bid Form. Bidders are required to comply with the requirements of P.L. 1975, c.127 (N.J.A.C. 17:27 and N.J.S.A. 10:5-31 et seq.), Affirmative Action. Bidders are required to comply with the requirements of P.L. 1999, c. 238 (N.J.S.A. 34:11-56.25 et seq,), New Jersey State Prevailing Wage Act, where applicable. Proposals are being solicited through a fair and open process in accordance with N.J.S.A 19:44A-2.02, et seq., and as such, contractors are exempt from the limitations on making political contributions under that law. Further, for that reason, as well as because of a language in the New JerseyaEUR(TM)s Annual Appropriations Act, refusal to disclose campaign contributions otherwise required by NJSA 19:44A-20.2 et seq. and 19:44A-20.25 et seq., will not adversely affect your consideration for award. In accordance with the provisions of N.J.S.A. 58:11B-26, N.J.A.C. 7:22-3.17(a)24 and 4.17(a)24, the contractor (subcontractor) shall comply with all of the provisions of N.J.A.C. 7:22-9 for the participation of small business enterprises owned and controlled by Socially and Economically Disadvantaged (SED) individuals. Bidders are advised the SED goal for this project is twelve percent (12%). Bidders also shall be required to comply with the provisions of the following additional State Laws and Regulations: 1. Local Public Contracts Law N.J.S.A. 40A:11-2 et. seq. as supplemented and amended. 2. P.L. 2017, c. 317, which establishing standardized changed conditions clauses for certain local public contracts and supplementing P.L. 1971, c. 198 (N.J.S.A. 40A: 11-1 et seq.). 3. Disclosure Notice (P.L. 1977, c33) N.J.S.A. 52:24.1). 4. Title VI of the Civil Rights Act of 1964, Employment on Public Works (N.J.S.A. 10:2-1). 5. New Jersey Law against Discrimination (N.J.S.A. 10:5-1 to 10:5-42). 6. Statement of Corporate Ownership (Stockholder Disclosure Certification) as required under N.J.S.A. 52:25-24.2 7. New Jersey Business Registration of Public Contractors (BRC) as required under N.J.S.A. 52:32-44 8. New Jersey Public Works Contractor Registration Act (N.J.S.A. 34:11-56.48 et. seq) 9. Foreign Corporation Law (N.J.S.A. 14A:13.3) 10. Use of Domestic Materials (N.J.S.A. 52:33-1 to 52:33-3) 11. Prompt Payment Law (N.J.S.A. 2A:30A-2 et seq.) 12. Procedures and Requirements of the Loan (N.J.A.C. 7:22-3.1, 4.1, and 5.1) 13. Environmental Assessment Requirements (N.J.A.C. 7:22-10.11) 14. Construction of Environmental Infrastructure Facilities (N.J.A.C. 7:14.2) In order to perform public work, the Successful Bidder and Subcontractors prior to contract award shall hold or obtain such licenses as required by State Statutes, and Federal and local Laws and Regulations The Commissioners of the CCMUA require the successful Bidder to prove the necessity of any change order(s). Therefore, please pre-examine everything before submitting your bid. Where the nature or amount of change orders cause suspicion that they are being submitted to purposely inflate your bid, the CCMUA will decline payment and refer the activity to the appropriate law enforcement authorities. The Commissioners will take the same approach to any other subsequent request for increases to the contract price. The Owner reserves the right to reject all of the Bids received, to re-advertise for Bids, to abandon the project, to waive any or all minor informalities in any Bid received and to accept any proposal all in accordance with applicable law.aEUR Bid security shall be furnished in accordance with the Instructions to Bidders The deadline for submitting questions is Monday, October 24 at 4:00 p.m. local time

Post-Bid

Water / Sewer

$700,000.00

Public - County

Renovation, Site Work

13

18

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
320
Active Projects
133
Bidding Soon
3,120
All Active Projects
1,395
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2022

December 15, 2022

img_map_placeholder

Multiple Locations, Gloucester Township, NJ

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.