BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Tonica, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of September 29 2022, the project has been awarded but awarded company not confirmed.** The Village of Tonica will receive sealed bids for the "2022 Roadway Improvements", consisting of three contracts: Contract 1 - Full Depth Reclamation: This contract includes the tilling, cement stabilization and reshaping of +-4,000SY of N 19th Road as shown on the plans. At the end of Contract 1 N 19th Road shall be left in a condition ready for the placement of the overlay. Contract 2 - Hot Mix Asphalt Paving: This contract consists of sweeping of the prepared cement stabilized base on N 19th Road to remove any loose materials, +-2,500 SY milling 1.5", and +-675 tons of bituminous paving on various streets and alleys in the Village. Contract 3 - Alley Resurfacing: This contract consists of +-4,200 SY of alley tilling, reshaping, and compacting, +-130 tons of stone, and +-4,200 SY of A-2 surface treatment at various alleys in the Village. Each Bid must be accompanied by a Bid Bond payable to the Owner for five (5) percent of the total amount of the Bid. As soon as the Bid prices have been compared, the Owner will return the Bonds of all except the three lowest responsible Bidders. When the Agreement is executed the Bonds of the two remaining unsuccessful Bidders will be returned. The Bid Bond of the successful Bidder will be retained until the Payment Bond and Performance Bond have been executed and approved, after which it will be returned. A Performance Bond and a Payment Bond, each in the amount of 100 percent of the Contract Price, with a corporate surety approved by the Owner, will be required for the faithful performance of the Contract. The Village reserves the right to reject any or all Bids, to waive technicalities in bidding, and to accept other than the low bid. No Bid may be withdrawn after the scheduled closing time for receipt of Bids for 60 days. Labor employed on this project shall be paid not less than the minimum prevailing rates of wages for the various classifications of workmen employed as determined by the State of Illinois Department of Labor

Post-Bid

Roads / Highways

$2,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
99
Bidding Soon
1,577
All Active Projects
687
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2022

September 19, 2022

img_map_placeholder

Multiple Locations, Tonica, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.