BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, asbestos abatement and renovation of a municipal facility in Napa, California. Completed plans call for the renovation of a municipal facility; for asbestos abatement for a municipal facility; and for site work for a municipal facility.

Award Details Contract Award Date: Aug 30, 2022 Contract Award Number: 140R2022C0023 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: LN42KVQUMX58 Contractor Awarded Name: AMG CONSTRUCTION COMPANY, INCORPORATED Contractor Awarded Address: Banning, CA 92220-6002 USA Base and All Options Value (Total Contract Value): $95950 A. Title: Lake Berryessa Asbestos Removal and Flooring B. Work site location: Lake Berryessa Field Office, Multipurpose Building 5520 Knoxville Road Napa, CA 94558 C. Site Visit Information: SEE FAR 52.236-27 SITE VISIT (Construction) Alt 1 (Pg.63) D. Estimated Price Range: The estimated cost of this project is between $25,000 and $100,000. E. Set Aside Information: Total Small Business Set Aside: NAICS 238990 and applicable size standard of $16.5 million. F. Email Proposals to dfobbs@usbr.gov Period of Performance: 09/01/2022 to 04/01/2023 Introduction The Bureau of Reclamation (Reclamation) proposes to replace the deteriorated vinyl floor tile of the Lake Berryessa Field Office's Multipurpose Building. Doing so will involve the removal of the supporting mastic which has tested positive for asbestos. 2.0 Background The Lake Berryessa Multipurpose Building houses seven permanent and up to five seasonal maintenance division employees. In addition, a staff of four Napa County Sheriff's Deputies providing the Lake's marine patrol work from the building along with colleagues assigned to the Napa County Managing partner agreement. During interagency trainings, incidents, and busy holiday weekends, the staff utilizing the multipurpose building and its three restrooms quadruples as employees from Napa County's emergency response contract, the Sheriff's Office, California Highway Patrol, and California Department of Fish and Wildlife gather for briefings, meals, and breaks. Staff observed deficiencies in these work spaced during the COVID-19 Pandemic Stay at Home Order, and the 2020 LNU Lightning Complex Fire in particular. Like much of the Field Office, the Multipurpose Building dates to around 1980. Conditions of the restrooms and office flooring have deteriorated resulting in numerous areas of exposed mastic around the structure. In 2022, Field Office employees tested the building's flooring, received word that the mastic contained asbestos, and identified a need to restore the structure's flooring. 3.0 Scope The purpose of this project is to safely remove deteriorated vinyl floor tiles, remediate asbestoscontaining mastic, grind and seal the remaining concrete first story floors, and install linoleum. 4.0 Task The following list is not comprehensive and the contractor shall be responsible for performing all necessary tasks for removal of asbestos containing materials in accordance with applicable regulations. 140R2022R0021 - Lake Berryessa Asbestos Removal and Flooring 6 The contractor shall remove all equipment and surplus materials brought to the site, all wastes generated on site, and shall repair any damage to government property. 4.1 Prepare Building for Abatement - Removal of furniture and personal effects in the work site is the responsibility of Bureau of Reclamation and Napa County Sheriff's Office personnel prior to the period of performance provided one month of notice prior to starting work is provided. - Notify Bay Area Air Quality Management District and California Division of Occupational Safety and Health prior starting work and pay for notification fees. - Isolate work area. - Set up decontamination system for contractors working on the site. - Detach three toilets and set aside. 4.2 Remove Flooring and Mastic - Run negative air filtration, monitor air in the work area air quality, and perform work necessary for final air quality testing. - Remove and dispose of approximately 550 square feet of carpeting and linoleum and 1800 square feet of vinyl tiles in 4 offices, 2 hallways, 3 bathrooms, gym, stairwell. - Remove approximately 1800 square feet of mastic from concrete. - Contractor is responsible for transport, manifest, and disposal of project wastes at a properly licensed landfill for asbestos containing materials. - Arrange sampling and analysis of remaining subfloor to verify it is free from asbestos containing materials. Pass a visual inspection by Reclamation personnel to confirm that asbestos containing materials have been removed prior to installation of new flooring. 4.3 1st Floor Finishing - Grind remaining concrete, if needed, to an even surface. - Patch remaining cracks and divots as necessary. - Stain concrete a neutral color. - Seal floors with topical sealer. Resulting surface must be stain resistant, slip resistant, and easy to clean. - Install trim at the junction between finished walls and flooring. - Remove containment and equipment. 4.4 2nd Floor Finishing - Repair and sand the floor so that is level. - Install commercial vinyl flooring - Install trim at the junction between finished walls and flooring. - Remove containment and equipment. SITE VISIT (CONSTRUCTION) - ALT I FEB 1995 (a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors are urged and expected to attend the pre-proposal conference and review the Industry Day Site Visit Presentation (Section J). The industry day presentation is for informational purposes only. Section C, descriptions and Specifications takes precedence over the attachments. (b) An organized pre-proposal site visit has been scheduled for: Date: July 15, 2022 Time: 10:00 AM Pacific Time Place: Dufer Point Visitor Center, Napa, CA 94558 ( 3833'01.9"N 12213'53.3"W ) Interested participants may contact the following individual for additional information: Contact: Jennifer Onufer Email: jonufer@usbr.gov Phone: 707-732-8504 All solicitation questions shall be emailed to Denard Fobbs (dfobbs@usbr.gov ) not later than 7/21/2022. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Municipal

$100,000.00

Public - Federal

Asbestos Abatement, Renovation, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
90
Bidding Soon
1,804
All Active Projects
763
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.