Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a civil project in Lake Wales, Florida. Conceptual plans call for site work for a road / highway; for paving for a road / highway; and for outdoor lighting for a road / highway.
As of April 19, 2023, information regarding the award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to 2025. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 01 Selection Method : Letter of Response and Interview Professional Liability Insurance : $250,000.00 Financial Management Numbers : 44927613201 44927613202 SR 60 From W of Saddlebag Road to E of Tiger Lake Rd TRC Members (Subject to Change) : Amber Lewis Jennifer McKinney QUAN YAO This project has been reserved for competition among only small businesses in accordance with the Department's Business Development Initiative (BDI) Program. Letter submittals for this project will only be accepted from firms that meet the definition of a small business set forth by section 337.027, Florida Statutes. The prime consultant submitting a Letter must be a qualified professional services firm and meet the small business definition of section 337.027, Florida Statutes at the time of submittal of the Letter and must maintain this status as a small business through contract execution. Longlist Date/Time 8/09/2022 Shortlist Selection Date/Time 8/16/2022 Phase II Submittal Deadline Date/Time 8/31/2022 Technical Review Committee Meeting 1 Date/Time 9/01/2022 Consultant Interviews Date/Time 9/01/2022 Final Selection Date/Time 9/13/2022 Negotiations Period Begin Date 9/21/2022 Negotiations Period Ending Date 11/01/2022 The method of contractor selection has not been determined at this time. FDOT - RFP Design - SR 60 From W of Saddlebag Road to E of Tiger Lake Rd
Conceptual
Roads / Highways
$12,943,437.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2025
E State Rd 60, Lake Wales, FL
Related To This Project
Lake Wales, FL
Bid Date: Aug 22 2022
Lake Wales, FL
Bid Date: Aug 19 2022
Lake Wales, FL
Bid Date: Sep 14 2022
Lake Wales, FL
--
Lake Wales, FL
Bid Date: Jan 12 2023
Lake Wales, FL
--
Lake Wales, FL
Bid Date: Sep 01 2022
Lake Wales, FL
--
Lake Wales, FL
Bid Date: Aug 29 2022
Lake Wales, FL
--
Lake Wales, FL
Bid Date: Jul 27 2022
Lake Wales, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.