Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 27, 2022 at 8:00 PM
Updated September 15, 2023
Site work, remodeling and renovation of a military facility in Hill Air Force Base, Utah. Completed plans call for the remodel of a military facility; for the renovation of a military facility; and for site work for a military facility.
This project includes full depth slab replacement of select Portland Cement Concrete panels and minor repairs on other panels on the section of the East Apron. This requirement is part of a larger project “Umbrella – Repair East Aircraft Parking Apron B5009” which includes 5 different phases. This requirement includes replacement of 236,000 SF of apron pavement located between Building 233 and Taxiway A. The project is 100% designed but not fully funded. The design drawings also include replacement of the PDM Towway located between Buildings 220, 223, & 236 which are excluded from the scope of work for this project. As noted in the design drawings, this scope of work will be constructed in a separate project. Drawings which include a red “X” over the sheet refer to a separate requirement and can be ignored. Some general overview sheets include drawings of both projects, but only the East Apron section described in the prior paragraph are included in this project. Full depth slab replacement of on select PCC panels and minor repairs on other panels on the section of the East Apron (about 236,000 SF of apron pavement located between Building 233 and Taxiway A).
Post-Bid
Military
$10,000,000.00
Public - Federal
Remodeling, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 27, 2022
October 3, 2022
To Be Determined, Hill Air Force Base, UT
Related To This Project
Hill Air Force Base, UT
Bid Date: Aug 01 2022
Hill Air Force Base, UT
Bid Date: Aug 08 2022
Hill Air Force Base, UT
Bid Date: Jan 26 2023
Hill Air Force Base, UT
Bid Date: Mar 05 2024
Hill Air Force Base, UT
--
Hill Air Force Base, UT
--
Hill Air Force Base, UT
--
Hill Air Force Base, UT
Bid Date: Sep 26 2022
Hill Air Force Base, UT
Bid Date: Sep 08 2022
Hill Air Force Base, UT
--
Hill Air Force Base, UT
Bid Date: May 19 2023
Hill Air Force Base, UT
Bid Date: Aug 18 2022
Hill Air Force Base, UT
Bid Date: Aug 04 2022
Hill Air Force Base, UT
Bid Date: Jun 28 2022
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed