BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in Cape Coral, Florida. Design plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Project scope consists of but is not limited to site work and renovation of utilities. As of August 9, 2023, an engineer has been selected. Design is anticipated to take 12 - 18 months. A timeframe for contractor bidding has not been announced. A firm timeline for construction start has not been determined. *The closed solicitation has been included below for reference: The selected Engineering Firm will perform all necessary work required to provide hydraulic modeling, design, permitting and bid ready construction documents for the North 3 Utilities Extension Project (UEP) including but not limited to: new water, sewer and irrigation mains, new wastewater lift stations, replacement of existing storm drain systems, fiber optic conduit, and reconstruction of existing roads. Bidding and Design Services during construction are also included. The City reserves the right to add Construction Engineering & Inspection (CEI) services by a separate agreement. Accordingly, the City would like all Firms to include their qualifications for CEI services for a project of this size and magnitude. All Prospective Bidders/respondents Are Hereby Cautioned Not to Contact Any Member of the City of Cape Coral Staff or Officials Other Than the Specified Contact Person. Question Please confirm the due date is 6/20/2023. The RFP - North 3 Professional Services - RCP2379JM.pdf lists 6/7/2023 as the deadline. Thank you. The City reserves the right to reject any or all bids/proposals in whole or in part and to waive any irregularities or informalities when in the best interest of the citizens of the City of Cape Coral. The method of Contractor Selection has not been Determined at this time Questions Deadline: 6/2/2023 04:00 PM (ET) Response Deadline: 6/20/2023 02:00 PM (ET)

Design

Water / Sewer

$211,473,398.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
24
Bidding Soon
438
All Active Projects
173
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2023

November 11, 2024

img_map_placeholder

Multiple Locations, Cape Coral, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.