Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a civil project in Cape Coral, Florida. Design plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Project scope consists of but is not limited to site work and renovation of utilities. As of August 9, 2023, an engineer has been selected. Design is anticipated to take 12 - 18 months. A timeframe for contractor bidding has not been announced. A firm timeline for construction start has not been determined. *The closed solicitation has been included below for reference: The selected Engineering Firm will perform all necessary work required to provide hydraulic modeling, design, permitting and bid ready construction documents for the North 3 Utilities Extension Project (UEP) including but not limited to: new water, sewer and irrigation mains, new wastewater lift stations, replacement of existing storm drain systems, fiber optic conduit, and reconstruction of existing roads. Bidding and Design Services during construction are also included. The City reserves the right to add Construction Engineering & Inspection (CEI) services by a separate agreement. Accordingly, the City would like all Firms to include their qualifications for CEI services for a project of this size and magnitude. All Prospective Bidders/respondents Are Hereby Cautioned Not to Contact Any Member of the City of Cape Coral Staff or Officials Other Than the Specified Contact Person. Question Please confirm the due date is 6/20/2023. The RFP - North 3 Professional Services - RCP2379JM.pdf lists 6/7/2023 as the deadline. Thank you. The City reserves the right to reject any or all bids/proposals in whole or in part and to waive any irregularities or informalities when in the best interest of the citizens of the City of Cape Coral. The method of Contractor Selection has not been Determined at this time Questions Deadline: 6/2/2023 04:00 PM (ET) Response Deadline: 6/20/2023 02:00 PM (ET)
Design
Water / Sewer
$211,473,398.00
Public - City
Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
14
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 20, 2023
November 11, 2024
Multiple Locations, Cape Coral, FL
Related To This Project
Cape Coral, FL
Bid Date: Oct 26 2022
Cape Coral, FL
Bid Date: Dec 09 2022
Cape Coral, FL
Bid Date: Oct 14 2022
Cape Coral, FL
Bid Date: Nov 22 2022
Cape Coral, FL
--
Cape Coral, FL
Bid Date: Mar 29 2023
Cape Coral, FL
Bid Date: Jul 15 2022
Cape Coral, FL
Bid Date: Oct 20 2022
Cape Coral, FL
Bid Date: Nov 10 2022
Cape Coral, FL
Bid Date: Nov 18 2022
Cape Coral, FL
Bid Date: Oct 25 2022
Cape Coral, FL
Bid Date: Nov 15 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.