Site work for a water / sewer project in Sacramento, California. Completed plans call for site work for a water / sewer project.

Scope of Services The Special Provisions cover in general, the reconstruction of combined sanitary sewer facilities within the following locations: 1) Castro Way from 25th Street to 25th Street and Marshall Way 2) Portola Way between 26th Street and Franklin Blvd 3) 37th Street Alley between 37th Street and 38th Street 4) Rice Alley between 17th Street and 18th Street 5) I Street between 30th Street to Alhambra Blvd 6) I Street between 33rd Street to 35th Street 7) 24th Street between Castro Way and 3rd Ave The work to be performed consists of replacing nearly 2,736 LF combined sewer pipeline by excavating and replacing 160 LF combined sewer pipeline using pipe bursting techniques, manholes, manhole outside drops, abandoning manholes, drains, sewer services, concrete flatwork, and associated work. The Contractor shall provide all labor, materials, tools and equipment, and shall perform all work necessary to complete the subject project in place and make all required connections to the existing combined sewer system as shown on the Plans and as specified herein. Project Type Bid Response Types Line Items Subcontractor Bid Bond General Attachment - CWTA Addendum A (required) Type of Award Lump Sum License Requirements A, Liquidated Damages $1,500.00 per calendar day Project Duration 165 working days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Pre-Bid Meeting No Online Q&A Yes Q&A Deadline 07/27/2022 12:00 PM (PDT) The amount of liquidated damages to be paid by the Contractor for failure to complete the work by the completion date (as extended, if applicable) shall be One Thousand Five Hundred Dollars ($1,500.00) for each calendar day, continuing to the time at which the work is completed

Bid Results

Water / Sewer

$1,347,569.00

Public - City

Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
81
Bidding Soon
1,514
All Active Projects
627
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 3, 2022

October 3, 2022

img_map_placeholder

Multiple Locations, Sacramento, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.