BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a bridge / tunnel in Conroe, Texas. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

All bids shall be submitted on the basis of lump sum pricing as provided in the bid specifications. Payment to successful bidder shall be net thirty (30) days after receipt of products, materials, services or invoices, whichever is later unless otherwise stated in specifications. The right is reserved, as the interest of Montgomery County Commissioners' Court may require rejecting any one or all bids and to waive any informality in bids received. All bids received after the above designated closing time will be returned unopened. A Bid Bond from an approved surety company-holding permit from the State of Texas will be required. Montgomery County is an Affirmative Action/Equal Opportunity Employer. Vendors are responsible for monitoring the Office of the Montgomery County Purchasing Agent website at for any Addenda, which may be issued. For any questions relating to the specifications or the submission of this bid, contact Kelly Vidal, CPPO, CPPB, NIGP-CPP, and Assistant County Purchasing Agent by email at Kelly.Vidal@mctx.org or by calling 936.760.6905. This project widens Nichols Sawmill bridge over Walnut Creek to 3 lanes. The project limits include the approaches from approximately 100 ft south to 100 ft north of the existing bridge. The project includes 4,024 SF of bridge deck, 1,005 LF of drilled shafts, 470 SY of treated subgrade, and 82 TONS of Type "D" hot mix asphaltic concrete pavement. The above description of the scope of work is general in nature and is only intended to provide an overview of the project. The complete detailed scope of work and bid items are contained in the plans and specifications. The contractor will have 240 calendar days to complete the project. This project shall be constructed under the Montgomery County General Conditions and the 2014 Texas Department of Transportation Technical Specifications.

Award

Bridges / Tunnels

$1,276,923.00

Public - County

Paving, Site Work

169

15

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
79
Bidding Soon
2,736
All Active Projects
970
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 5, 2022

December 5, 2022

img_map_placeholder

To Be Determined, Conroe, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.