Renovation of an educational facility in Lexington, Kentucky. Completed plans call for the renovation of a educational facility.

As of October 27, 2022, this project has not yet been awarded. A timeline for award has not yet been established. The project is to prepare the existing roof membrane for a urethane foam-roof (SPFR) system. The rood area consists of are eight (8) roof sections separated by standing seam metal spine-roofs. In addition to the foam roof system installation, the metal spine roofs are to be repaired and coated and all rooftop EIFS wall surfaces (Exterior Insulated Facia-wall System) are to be repaired and coated. Bids will be received from Prime Contractors on a Lump Sum Amount for the total project. All phases of the work shall be bid to and through the Prime Contractors. Bids shall be submitted in the manner herein described and on the official proposal form included with the conditions and specifications and shall be subject to all the conditions as set forth and described in the Bid Documents. Bids shall be submitted only on the Official Forms supplied by the University of Kentucky, Construction Procurement Section. Failure to comply with the foregoing requirements will be cause for invalidation of bid. All phases of the work shall be bid to and through the Prime Contractors. Bids shall be submitted in the manner herein described and on the official proposal form included with the conditions and specifications and shall be subject to all the conditions as set forth and described in the Bid Documents. Bids shall be submitted only on the Official Forms supplied by the University of Kentucky, Construction Procurement Section. Failure to comply with the foregoing requirements will be cause for invalidation of bid. Final award of Contract will be made on the basis of the lowest, responsive and responsible bid which offers the best value. The time for substantial completion for all phases shall be 90 Calendar Days and Final Completion shall be 30 days thereafter. Substantial Completion will include all site restoration completed, site clean-up and fully functional. All bids shall be accompanied by a bid guarantee of not less than five (5%) percent of the amount of the base bid. A 100% Performance Bond and 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instruction to Bidders, General Conditions and Special Conditions. Payments for Plans, Specifications and Official Bid Documents must be made to Lynn Imaging before a set of documents will be issued. Notes: Contractors that receive plans and specifications from other sources than Lynn Imaging must request a Form of Proposal from the University's Purchasing Representative to be registered as plan holders and to receive addendums. Potential Contractors must identify the position of their firm as a prime bidder, miscellaneous subcontractor, material supplier or other when ordering of picking up Plans and Specifications. Anyone wishing to discuss specific items is requested to submit the items in writing to David Stefanic Construction Procurement. Written questions can be submitted by email to: cckbidquestions@uky.edu The University of Kentucky, Construction Procurement Section, reserves the right to reject any and all bids and to waive all formalities and/or technicalities where the best interest of the University may be served.

Bid Results

Educational

$230,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
30
Bidding Soon
904
All Active Projects
363
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 3, 2022

September 2, 2022

img_map_placeholder

740 W New Cir Rd, Lexington, KY


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.