Site work for a water / sewer project in Bismarck, North Dakota. Completed plans call for site work for a water / sewer project.

All bids will be submitted to the City Administrator (PO Box 5503, Bismarck, ND 58506-5503) or otherwise deposited with the City Administrator (221 North 5th Street, Bismarck, ND 58501) and shall be sealed and endorsed "Bismarck Water Treatment Plant Filters 1-6 Face Piping Replacement and 12 MGD Accelator Effluent Pipe Improvements". If a bid is to be faxed, the bid must be sent to a bidder's agent independent of the City of Bismarck, placed in a sealed envelope, labeled according to this specification, and delivered to the office of the City Administrator prior to the bid deadline. In light of the COVID-19 epidemic, the City would like to protect you and City staff as much as possible. The City is offering the ability to appear at the bid opening via video/audio on Microsoft Teams, in addition to appearing in person. There is no charge for this. If you wish to appear virtually at the bid opening, please send your email address to gnicholson@bismarcknd.gov no later than 3:00 p.m. on the bid opening day. Project Estimated Value is $3 to $3.5 million The Project includes, but is not limited to, the following work: A. Filters 1-6 Face Piping Replacement: 1. All labor, equipment, materials, and services necessary to perform the work of replacing the filter face piping, including fittings, manual valves, electric operated valves, meters, and differential pressure sensors. Includes 14" Filter Backwash Supply Piping, 16" Filter Backwash Waste Piping, 8" Filter Effluent Piping, 6" Filter-to-Waste Piping, and 6" Surface Wash Supply Piping. 2. Electrical and Controls associated with the motor operated valves, instrumentation and controls. Portions of SCADA programming are to be completed by the Owner. This includes receiving signals and displaying the information on the City's system. Contractor is required to provide and route control wiring to establish specified control loops. 3. Installation of new Insulation over all new piping. 4. Replacement of the section of surface wash piping and fittings inside the filters that are cast-iron with stainless steel. 5. Cleaning each 16-inch filter influent pipe. 6. New 2" potable water line that will extend the full length of Filters 1 -6 piping gallery. 7. Coat/Recoat the influent channel to Filters 1-6. 8. Cleanup, any building restoration, and all other miscellaneous work required, not herein mentioned, but inferred from the construction contracts. B. 12 MGD Accelator Effluent Pipe Improvements: 1. All labor, equipment, materials, and services necessary to perform the work of replacing the 30" effluent pipe with a 36" effluent pipe. 2. Replacement of the butterfly valve on the effluent pipe. 3. Installation of air release devices. 4. Installation of new Insulation over new piping. 5. Cleanup, any building restoration, and all other miscellaneous work required, not herein mentioned, but inferred from the construction contracts. BID DOCUMENTS ARE NOT YET AVAILABLE FOR DOWNLOAD. Complete digital project bidding documents are available at electronically.You may download the digital plan documents for Fifty Dollars ($50.00) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid Results General Const. - Swanberg Construction - $2174000 Elect., I & C Const - Edling Electric - $687500

Bid Results

Water / Sewer

$2,861,500.00

Public - City

Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Progress Payment Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting, Closeout Submittals, Bonds, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Louvers and Vents, Vents
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Countertops
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Fans
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Circuit Protective Devices, Fuses, Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
5
Bidding Soon
77
All Active Projects
26
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2022

October 10, 2022

img_map_placeholder

Multiple Locations, Bismarck, ND


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Filters 1-6 Face Piping Replacement and 12 MGD Accelator Effluent Pipe Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.