BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Schiller Park, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

President and Board of Trustees of the Village of Schiller Park, Cook County, Illinois, that sealed bid proposals will be received for the following improvement: 2022 STREET, WATER MAIN AND SEWER IMPROVEMENTS The work shall take place on various streets within the corporate limits of Schiller Park, Illinois. The scope of work includes the installation of 8" ductile iron watermain, directionally bored 1" copper services with box, valves, fire hydrants and HMA patching of water trench. The work shall also include the installation of new 8" PVC Sewer, RDMH, Ty'C'CB and Inlets. In addition, the scope of work of the project involves the removal and replacement of partial curb and gutter, sidewalks, and driveway aprons, adjustments, reconstructions of drainage structures, replacement of drainage structures, milling the existing asphalt surface, pavement patching, installation of a hot-mix asphalt binder course, and hot-mix asphalt surface course, spot restoration of the parkways, and all other appurtenant work thereto. The location of the work shall be as follows: Eastwood Avenue West End to Old River Road Water Main, Services and Paving Scott Street Irving Park Road to just North of Sunnyside Avenue -Water Services Judd Avenue Wehrman Avenue to Montrose Avenue Water Main & Services Wehrman Avenue Judd Avenue to Montrose Avenue Water Services Montrose Avenue Wehrman Avenue to Scott Street Water Services Agatite Avenue West End to Scott Street Water Main & Services Sunnyside Avenue West End to Scott Street Water Main & Services Ivanhoe Court Ivanhoe Avenue to North Cul-de-Sac - Sewer & Paving No bidding documents will be issued after 4:00 P.M. on Thursday July 28, 2022. No bid shall be withdrawn after the opening of the Proposals without the consent of the President and Board of Trustees of the Village of Schiller Park for a period of sixty (60) days after the scheduled time of bid opening. The Contractor and Subcontractor shall comply with all regulations issued pursuant to Prevailing Wage Act (820 ILCS 130), and other applicable Federal Laws and regulations pertaining to labor standards. The Village of Schiller Park reserves the right to determine the lowest, responsive and responsible bidder, to waive irregularities and to reject any or all bid proposals.

Award

Roads / Highways

$2,054,453.00

Public - City

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
91
Bidding Soon
1,844
All Active Projects
804
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2022

August 11, 2022

img_map_placeholder

Multiple Locations, Schiller Park, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.