BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Dodgeville, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

. CONTRACT - ESCH ROAD IMPROVEMENTS; This Contract is for the resurfacing of 3/10 of a mile of Each Road. The work will include the furnishing and installation of 3 inches of new aggregate over existing subcase, the furnishing and installation of 18' wide, 3" thick Hot Mix Asphalt (HMA) pavement, and the furnishing and installation of shoulders after asphalt. FUNDING SOURCE: This project is funded through the Local Road Improvement Program (LRIP) as a TRIP allocation project and is partially funded through the State of Wisconsin and the Town of Dodgeville. BIDDING FORMALITIES: The Town of Dodgeville reserves the right to waive formalities in bidding and to reject any and all bids. No bid shall be withdrawn without the consent of the Owner for a period of forty-five days after the scheduled time of the bid opening. BID BOND: A satisfactory bid bond executed by the bidder and a licensed surety company or a certified check payable to the Town of Dodgeville in an amount not less than 5% of the maximum bid, shall accompany each bid as a guarantee that, if the bid is accepted, the bidders will execute and file the proper contract and bonds within ten days after the award of the contract. WAGE RATES and STATUTES: The letting of the work described herein is subjected to the provisions of Section 66.0901 and 66.0903 of the Wisconsin Statutes. The minimum wage rates to be paid for the project shall be in accordance with Section 66.0903 of the Wisconsin Statutes. No State or Federal Prevailing Wage Rates apply to this project. INSURANCE: Contractor shall carry Public Liability Insurance and Workmen's Compensation Insurance that is satisfactory to the Owner. CONTRACT SECURITY: The successful bidder for this Contract will be required to furnish a corporate performance bond and payment bond in an amount equal to one hundred percent (100%) of the contract price, said bonds are to be issued by a responsible surety approved by the Owner.

Award

Roads / Highways

$63,336.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
28
Bidding Soon
567
All Active Projects
264
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2022

September 1, 2022

img_map_placeholder

Esch Rd, Dodgeville, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.