BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Battle Creek, Michigan. Completed plans call for site work for a playground / park / athletic field.

The City is soliciting proposals from qualified firms to provide restoration services to the "Welcome to Battle Creek" wall, fountain system, and the Sojourner Truth Monument located at Monument Park, 110 Michigan Ave E., in Battle Creek, MI The "Welcome to Battle Creek" stonewall and fountain system was originally constructed in 1997/98 as part of the Monument Park project. Although the fountain was updated several years ago, other than occasional cleaning and sealing of the fountain pools, an overall renovation to the structure has not happened. Before submitting a proposal, firms shall carefully examine the scope of work and shall fully inform themselves as to all existing conditions and limitations and shall indicate in the proposal all items requested. This project shall provide an overall restoration to our nearly 25 yr old destination markers for Battle Creek. The scope of work for the "Welcome to Battle Creek" wall/fountain shall include: Thorough cleaning/power washing the entire structure Tuck-pointing the mortared stone veneer joints Re-caulking the precast concrete joints Sealing the stones. Removing the iron deposits and stains from the stone veneer Waterproofing the fountain pools Updating the flood and fountain lighting to LED Replacing the cover to the pump house Evaluating the piping inside the pump house for efficiencies The scope of work for the Sojourner Truth monument shall include: Thorough cleaning/power washing the entire structure Tuck-pointing the mortared stone veneer joints Recaulking the precast concrete joints Powder coating the handrail, light covers, Updating the lighting to LED Resetting the brick pavers Restoring the bronze plaques Repairing the cracks in concrete Restoring the concrete finish Restoring the sculpture finish TECHNICAL QUESTIONS to Chris Huff, clhuff@battlecreekmi.gov

Post-Bid

Playgrounds / Parks / Athletic Fields

$500,000.00

Public - City

Site Work

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
56
Bidding Soon
917
All Active Projects
382
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2022

September 8, 2022

img_map_placeholder

110 Michigan Ave, Battle Creek, MI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.