EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 17, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Syosset, New York. Completed plans call for site work for a water / sewer project.

**As of October 17, 2022, the anticipated construction start date and completion date are not yet determined. This project consists of three separate contracts for compliance with Wicks Law and generally consists of the construction of a new advanced oxidation process and granular activated carbon facility including a building enclosure and new piping, valves, chemical treatment, standby generators, and all appurtenances and accessories as shown on the Drawings and specified herein. The work also includes all associated connections to the existing wells and boosters at the site, power, controls, SCADA, all wiring and devices, site paving and restoration, and other utility work as shown and called for in conformance with the Contract Documents. Contractor shall comply with all NYS Environmental Facilities Corporation (NYS EFC), Minority/Women's Business Enterprise (M/WBE) and Service-Disabled Veteran Owned Business (SDVOB) Program requirements as well as all applicable Village, County, State and Federal Laws and Regulations. The Contract Documents, consisting of Advertisement for Bids, Instructions to Bidders, Bidder's Checklist, Bid, Bid Bond, Statement of Surety's Intent, Agreement, General Conditions, Supplementary Conditions, Payment Bond, Performance Bond, Maintenance Bond, Drawings, Specifications and Addenda may be examined at the following locations:Jericho Water District 125 Convent Road Syosset, NY 11791 D&B Engineers and Architects, D.P.C. 330 Crossways Park Drive Woodbury, NY 11797-2015. Each Bid must be accompanied by a certified or bank cashier's check made payable to OWNER, or a Bid Bond issued by a surety licensed to conduct business in the state where the Project is located and having a Best Rating of A- or better from A.M. Best Company and named in the current list of "Companies Holding Certificates of Authority as Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury, in an amount not less than 5% of the amount of the Bid submitted. The list may be ordered from the Government Printing Office Bookstore, 26 Federal Plaza, Room 110, New York, NY 10278, (212) 264-3825. This project is to be funded in whole or in part using funds from the New York State Environmental Facilities Corporation (NYSEFC). All projects funded by the NYSEFC must conform to the goals stated in NYS Executive Law - Article 15-A. The Contractor will agree to make documented "good faith efforts" to utilize a combined goal of 30% Minority Business Enterprise(s) and Women's Business Enterprise(s) for this project; and a 6% Service-Disabled Veteran Owned Business goal. Each Bidder must complete and submit with their bid the "Iranian Investment Activities Certification" provided in the Bid Form in compliance with General Municipal Law 103-g, Iranian Energy Sector Divestment. Each Bidder must complete and submit with their Bid the "Certification of Compliance with New York State Labor Law Section Two Hundred One-G" provided in the Bid Form regarding the implementation of a written policy addressing sexual harassment prevention in the workplace. The Bidder to whom the OWNER proposes to award the Contract will be required to furnish performance and payment bonds and the necessary insurance certificates as prescribed in the General Conditions and the Supplementary Conditions upon the execution of the Agreement. The Contractor will agree to make documented "good faith efforts" to utilize a combined goal of 30% Minority Business Enterprise(s) and Women's Business Enterprise(s) for this project; and a 6% Service-Disabled Veteran Owned Business goal. Bidders are required to execute a non-collusive bidding certification required by Section 103-d of the General Municipal Law of the State of New York. The attention of Bidders is particularly called to the requirements as to the conditions of employment to be observed and the minimum wage rates to be paid under the contracts. Bidders are also required to comply with the anti-discrimination provisions of Sections 290-301 of the Executive Law of the State of New York. The OWNER reserves the right to reject any or all of the Bids received, to readvertise for Bids, to abandon the project, to waive any or all informalities in any Bid received and to accept any proposal which the OWNER decides to be for the best interest of the OWNER. A public meeting may also be held at the time and place noted above wherein the District will conduct such regular and other business which is properly brought before the Board of Commissioners. Note: All questions must be submitted in writing to Benjamin Giese no later than 2:00 p.m. on Thursday, August 18, 2022. Questions must be sent via email to: bgiese@db-eng.com.

Award

Water / Sewer

$6,878,000.00

Public - County

Site Work

133

46

73

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Manufacturer?s Field Services, Mockups, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Cast Decks and Underlayment, Cast Underlayment
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Common Work Results for Masonry, Masonry Anchors, Stone Anchors, Masonry Accessories, Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry, Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings, Metal Gratings, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Rough Carpentry, Wood Framing, Engineered Wood Products, Heavy Timber, Sheathing, Underlayment, Shop-Fabricated Structural Wood, Laminated Veneer Lumber, Finish Carpentry, Millwork, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Sheet Waterproofing, Thermal Protection, Thermal Insulation, Vapor Retarders, Air Barriers, Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels, Siding, Flashing and Sheet Metal, Flexible Flashing, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Preformed Joint Seals, Joint Fillers, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Entrances and Storefronts, Steel-Framed Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Glazed Aluminum Curtain Walls, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Common Work Results for Finishes, Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Lath, Metal Lath, Gypsum Board, Tiling, Ceramic Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Wood Flooring, Wood Athletic Flooring, Resilient Flooring, Resilient Base and Accessories, Resilient Tile Flooring, Terrazzo Flooring, Carpeting, Access Flooring, Wall Finishes, Wall Coverings, Stone Facing, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting, Exterior Painting, Interior Painting, Decorative Finishing
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Plaques, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Exterior Specialties, Exterior Protection, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Key and Card Control Units, Residential Equipment, Foodservice Equipment, Entertainment Equipment, Musical Equipment, Bells, Athletic Equipment, Recreational Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Art, Sculptures, Cast Sculpture, Window Treatments, Casework, Manufactured Wood Casework, Manufactured Plastic-Laminate-Clad Casework, Specialty Casework, Laboratory Casework, Countertops, Furnishings and Accessories, Portable Lamps, Lamps, Rugs and Mats, Runners, Furniture, Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Amusement Park Structures and Equipment, Wave Generating Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Hydraulic Elevators, Escalators and Moving Walks, Lifts, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, HVAC Piping Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, Diffusers, Registers, and Grilles, HVAC Air Cleaning Devices, Central Heating Equipment, Heat Exchangers for HVAC, Central HVAC Equipment, Air-to-Air Energy Recovery Equipment, Heat-Wheel Air-to-Air Energy-Recovery Equipment, Indoor Central-Station Air-Handling Units, Modular Indoor Central-Station Air-Handling Units, Packaged Outdoor HVAC Equipment, Packaged, Outdoor, Central-Station Air-Handling Units, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Air Coils, Unit Ventilators, Unit Heaters, Radiant Heating Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Vibration and Seismic Controls for Electrical Systems, Overcurrent Protective Device Coordination Study, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Controllers, Enclosed Controllers, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Engine Generators, Battery Equipment, Batteries, Static Uninterruptible Power Supply, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Commissioning of Communications, Data Communications, Data Communications Network Equipment
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Pruning, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Seal Coats, Rigid Paving, Concrete Paving, Curbs and Gutters, Concrete Curbs and Gutters, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Topsoil Placement and Grading, Turf and Grasses, Plugging, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Hoists, Derricks, Lifting Devices, Clamps, Hooks, Lifts, Manufacturing Equipment, Machining Equipment, Drilling Equipment, Assembly and Testing Equipment, Applicators
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors, Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
511
Active Projects
260
Bidding Soon
4,590
All Active Projects
2,106
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2022

October 25, 2022

img_map_placeholder

66 Stillwell Ln, Syosset, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

1,4 - Dioxane and PFOA Treatment at Stillwell Lane - Wells 20 & 21 - Mechanical Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.