Published November 4, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Syosset, New York. Working plans call for the renovation of a educational facility.

**As of November 04 ,2022, bids received were rejected as they were over the budget. Project will rebid but no definite date yet.** Checks or money orders shall be made payable to Syosset Central School District. Plan deposit is refundable in accordance with the terms in the Instructions to Bidders to all submitting bids. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. Complete digital sets of Bidding Documents, Drawings and Specifications, may be obtained online as a download for Forty Nine Dollars and 00 cents ($49.00) at the following website All bid addenda will be transmitted to registered bidders via email and will be available at online. Bidders who have paid for hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use, and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered bidders to obtain hard copies of the bid addenda. Bids must be made on the standard proposal form in the manner designated therein and as required by the specifications that must be enclosed in sealed opaque envelopes bearing the name of the job and name and address of the bidder on the outside, addressed to: "PURCHASING AGENT, SYOSSET CENTRAL SCHOOL DISTRICT", clearly marked on the outside: Bid For: "POOL VENTILATION AT SYOSSET HIGH SCHOOL". The School District is not responsible for bids opened prior to the bid opening if bid number and opening date do not appear on the envelope. Bids opened prior to date and time indicated are invalid. The bidder assumes the risk of any delay in the mail, or in the handling of the mail by employees of the Syosset Central School District, as well as of improper hand delivery. Each proposal submitted must be accompanied by a certified check or bid bond, made payable to the, in an amount equal to ten percent (10%) of the total amount of the bid, as a commitment by the bidder that, if its bid is accepted, it will enter into a contract to perform the work and will execute such further security as may be required for the faithful performance of the contract. Certification of bonding company is required for this bid, see Instructions for Bidders. Each bidder shall agree to hold his/her bid price for forty-five (45) days after the formal bid opening. The Board reserves the right to reject any or all bids, waive any informality and to accept such bid which, in the opinion of the Board, is in the best interests of the School District. By Order of the Board of Education Syosset Central School District 99 Pell Lane Syosset, NY 11791

Final Planning

Educational

$1,612,000.00

Public - City

Renovation

35

18

5

9

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Post-Tensioned Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Sheet Waterproofing, Thermal Protection, Thermal Insulation, Vapor Retarders, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Flooring, Resilient Flooring, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Art, Sculptures, Cast Sculpture, Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems, Swimming Pool Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Connectors, HVAC Fans, HVAC Air Cleaning Devices, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
503
Active Projects
283
Bidding Soon
4,729
All Active Projects
2,146
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2022

May 4, 2023

img_map_placeholder

70 S Woods Rd, Syosset, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Pool Ventilation at Syosset High School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.