BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a transportation facility in Boston, Massachusetts. Completed plans call for the renovation of a transportation facility.

Amtrak intends to engage the construction services of a qualified contractor for the Southampton Street Rail Yard Building Management System Controls Upgrades projects in Boston, Massachusetts. The proposed work generally includes, but is not limited to, the following: A. This project includes the installation of new exhaust fans, code compliant make-up system, electrical power connections to the fans and make-up air system, as well as commissioning & air balancing the new controls and exhaust fan systems. Work expected to be performed by Contractor Forces: Replace existing rooftop exhaust fans and suspended makeup air units Furnish and install new ductwork, supports, wall penetration sealing Provide power, controls and interlocks with exhaust fans and makeup air units Provide structural support for rooftop makeup-air units Provide electric unit heaters in warehouse Minimum Qualifications: Comparable Prime Contractor Project experience ($400K minimum) in the last 5 years Qualified list of construction personnel Financial resources /capability/bonding Resource commitment to completion of Project by June 30, 2023. Davis Bacon and certified payroll reporting It is anticipated that a Solicitation for this procurement will be issued soon after this ad closes. Note: If your firm has been pre-qualified for previous projects a letter of interest is only required if not changes have occurred to the previous submitted qualification package. In an effort to provide "maximum practicable opportunity" to participate in the provision of goods and services to Amtrak, prime firms under agreement with Amtrak are required to put forth Good Faith Efforts to contract with Disadvantaged Business Enterprises (DBEs). Therefore; a DBE subcontracting plan goal shall be established for this opportunity. IMPORTANT NOTE: The information contained herein may not be reissued or redistributed in any form or manner in whole or in part without the advanced expressed written consent and permission of Amtrak.

Post-Bid

Transportation Terminals

$1,000,000.00

Public - Federal

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
567
Active Projects
293
Bidding Soon
4,045
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2022

September 13, 2022

Project location map

2 Frontage Rd, Boston, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.