BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Rancho Mirage, California. Completed plans call for site work for a water / sewer project.

The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications and Contract Documents for the above-stated project. The general items of work to be done hereunder consist of installing sanitary sewer pipe, sewer manhole, 18" DIP water line, water valve & assembly, constructing meandering sidewalk, and installing fiber optic conduit, as well as all other appurtenant or related work as shown or referenced on the plans. Any contract entered into pursuant to this notice will incorporate certain provisions of the State Labor Code. Compliance with the prevailing rates of wages and apprenticeship employment standards established by the State Department of Industrial Relations will be required. No bidders will be discriminated against on the basis of race, denial of family and medical care leave, religious creed (including religious dress and grooming practices), color, national origin (including language use restrictions), ancestry, physical disability or mental disability (including HIV and Aids), medical condition (cancer and genetic characteristics), genetic information, military or veteran status, marital status, gender, gender identity, gender expression, sex (which includes pregnancy, childbirth, breastfeeding and medical conditions related to pregnancy, childbirth or breastfeeding), age or sexual orientation in any consideration leading to the award of contract. Proposals must be accompanied by a proposal guarantee consisting of a certified check or bid bond payable to the CITY in the amount of ten percent (10%) of the total amount bid. If specified in Schedule A, in lieu of payment and performance bonds, CONTRACTOR may furnish CITY either cash, a Letter of Credit, or an Agreement of Deposit as security for performance. Said security shall be in an amount not less than 100% of the cost estimate and, in addition, for payment of those furnishing materials, labor or equipment in an amount not less than 100% of the cost estimate. Said security agreements The contract documents call for monthly progress payments based upon the engineers' estimate of the percentage of work completed. The CITY will retain 5 percent of each progress payment as security for completion of the balance of the work. At the request and expense of the successful bidder, the City will pay the amounts retained upon compliance with the requirements of Public Contract Code, Part 5, Section 22300, and the provisions of the contract documents pertaining to Substitution of Securities City staff will not be available to respond to questions on the day of bid opening. The CITY reserves the right to reject any or all bids, to waive any irregularity, to accept any bid or portion thereof, and to take all bids under advisement for a period of sixty (60) days. At the time of contract award, the prime contractor shall possess a valid Class A contractor's license and/or a combination of Class "C" specialty contractor's license(s) sufficient to perform the work.

Bid Results

Water / Sewer

$732,221.00

Public - City

Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
68
Bidding Soon
913
All Active Projects
431
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2022

October 31, 2022

img_map_placeholder

Multiple Locations, Rancho Mirage, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.