Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 23, 2022 at 8:00 PM

Updated September 14, 2023

Demolition, site work, renovation and addition to an educational facility in Saint Marys, Georgia. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

A. Before submitting a bid, each bidder will be responsible to make or obtain such explorations, tests and data concerning physical conditions (surface, subsurface and underground facilities) at or contiguous to the site, or otherwise may affect cost, progress, performance or furnishing of the work and which bidder deems necessary to determine its bid for performing and furnishing the work in accordance with the time, price and other terms and conditions of the Contract Documents. B. The Work of Project is defined by the Contract Documents and consists of the following: 1. A single story CMU masonry load bearing building with bar joist, and light weight insulation concrete roof system. The building will be clad with brick, aluminum curtain wall windows and a signal ply PVC membrane roof. The interior will be painted CMU Masonry, acoustical tile / Gyp ceiling systems, hollow metal door frames, with both wood and hollow metal doors. The floor finishes will be carpet, tile, VCT and sealed concrete. The mechanical system will be a combination of PTAC, and mini split units with a ERU on the roof to provide fresh air. The site work will be minimal disturbed area to build the building and achieve positive drainage. The addition will have a standalone automatic fire sprinkler system and all other system will tie back into the existing building. Additions to Existing Sugarmill Elementary School using Cares Funding (ESSER) - Renovations to this school will also bid on the same day under "Sugarmill Elementary School Renovations ESSER" & "Sugarmill Elementary School Renovations State DOE" - Phase 2 of this project consists of building construction only. Site work is currently underway Estimated Start Date: 8/18/2022 Estimated End Date: 7/1/2023

Post-Bid

Educational

$10,000,000.00

Public - County

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
48
Bidding Soon
861
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2022

August 31, 2022

Project location map

2885 Winding Rd, Saint Marys, GA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed