Site work and new construction of a municipal facility in Newport, Oregon. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.
*As of November 1, 2022, a general contractor has been awarded. Oregon State University ("OSU" or "Owner") is conducting a competitive MULTI-STEP Request for Proposals ("RFP") process to retain one firm for the PacWave Project's Medium Voltage Utility Connection and Monitoring Facility ("UCMF") build. The Proposer may sub-contract as necessary to ensure a comprehensive team. The Work generally consists of 'Phase 2 - Buildings and Site Work Complete,' for the construction of the UCMF, a facility comprised of 3 buildings, and site improvements of a 4.44-acre unimproved parcel of OSU-owned property where the UCMF will be located on Wenger Lane, Seal Rock OR south of Newport OR. Specialty medium voltage electrical work and equipment is also part of the Work. This facility will be grid connected to Central Lincoln People's Utility District. The summary information in this section provides an overview of the primary scope of work. The primary scope of work, including the Owner Architect's design documents, is further detailed in Exhibits 5 and 6 ("Scope of Work" or "the Work"). It is understood that every item in the Scope of Work may not be specifically mentioned or included in this RFP and that shall not preclude the Contractor from the responsibility to complete all necessary Work to ensure the completion of the Work satisfactory to OSU. Contractor shall perform all Work to the standard of care recognized as typical of this industry. QUESTION DEADLINE: AUGUST 5, 2022, at 5:00 PM Pacific Time (PT) Notice of Intent to Award SEPTEMBER 20, 2022 Estimated Contract execution By OCTOBER 5, 2022 Estimated Notice to Proceed By OCTOBER 6, 2022 The Work generally consists of Phase 2 - Buildings and Site Work Complete, for the construction of the Medium Voltage Utility Connection and Monitoring Facility ("UCMF" or "Facility"), a Facility comprised of 3 buildings, and the site improvements of a 4.44 acre unimproved parcel of OSU-owned property where the UCMF will be located. See note below pertaining to the Phase 1 - Site Prep. Site improvements include earthwork, grading, and typical site preparation for building construction, paving, sub-station aggregate, storm drainage, utility connections, sidewalks, and fencing. The existing private gravel drive, Wenger Lane, which extends thru the site to adjacent properties to be final graded and paved. The buildings include Power Conditioning Building, 140 feet by 80 feet; Switchgear Building, 80 feet by 48 feet, both to be constructed as pre-engineered metal buildings; and a Control Building, 85 feet by 50 feet, wood frame, slab-on-grade construction. Specialty medium voltage electrical work and equipment is also part of the Work. Specialty medium voltage Work includes large terrestrial vault, ground wire grid, switchgear equipment, ground switch, medium voltage cables, and relay panels. This facility will be grid connected to Central Lincoln PUD. Note: Phase 1 - Site Prep was performed from 2021 to 2022 and has been completed. This Phase 1 - Site Prep included site clearing, major earthwork excavation and export, building pad site subgrade prep, storm drainage, partial Hwy 101 approach improvements and utility crossings, waterline upgrades/replacement, and erosions control measures. The existing Wenger Lane was widened and regraded. No paving occurred.
Award
Municipal
$15,292,346.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 16, 2022
October 10, 2022
Multiple Locations, Newport, OR
Related To This Project
Newport, OR
Bid Date: Nov 30 2022
Newport, OR
Bid Date: Jan 05 2023
Newport, OR
Bid Date: Sep 15 2021
Newport, OR
Bid Date: Feb 02 2022
Newport, OR
Bid Date: May 14 2020
Newport, OR
Bid Date: Apr 22 2022
Newport, OR
Bid Date: Apr 27 2022
Newport, OR
--
Newport, OR
Bid Date: Nov 08 2022
Newport, OR
Bid Date: Nov 08 2022
Newport, OR
Bid Date: Oct 11 2022
Newport, OR
Bid Date: Oct 03 2022
Newport, OR
Bid Date: Oct 11 2022
Newport, OR
Bid Date: Nov 21 2022
The Dalles, OR
Bid Date: Nov 30 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.