EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 28, 2023 at 8:00 PM

Updated October 1, 2024

Site work and new construction of a water / sewer project in Waterford, Pennsylvania. Completed plans call for the construction of a 3,620-square-foot water / sewer project; and for site work for a water / sewer project.

Project shall include the construction of a 3,620-square foot pole timber style building, including steel roof, windows, and doors at the Waterford Wastewater Treatment Plant. Each bid must be accompanied by proposal security in the form of a certified check, bank cashiers check, treasurer's check, or bid bond in an amount equal to not less than ten percent of the total bid price in accordance with provisions contained in the Instructions to Bidders section of the specifications. Proposal Security shall be made payable to the Municipal Authority of the Borough of Waterford. Contractors must comply with the Prevailing Wage Rate Determinations, as specified in the Contract Documents. No bidder may withdraw its bid for a period of 60-days after date of bid opening. Copies of contract documents and specifications may be examined at the Municipal Authority of the Borough of Waterford Office or at the office of Greenman Pedersen, Inc., 8 Gibson Street, North East, Pennsylvania 16428. The Municipal Authority of the Borough of Waterford reserves the right to reject any or all bids, to accept or reject any part of any bid, and to waive any and all informalities in connection therewith.

Post-Bid

Water / Sewer

$228,000.00

Public - City

New Construction, Site Work

23

21

2

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Testing Laboratory Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Site Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Panel Doors, Hardware, Door Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Fireplaces and Stoves, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Storm Drainage, Sump Pumps, Plumbing Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets, Central Cooling Equipment, Packaged Water Chillers, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Flexible Paving, Aggregate Surfacing, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Storm Utility Drainage Piping, Public Storm Utility Drainage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Manufacturing Equipment, Dies and Molds, Molds, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
81
Bidding Soon
946
All Active Projects
422
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2023

December 11, 2023

img_map_placeholder

30 S Park Row, Waterford, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Construction of the Sludge Press Building - General Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.