BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 20, 2022 at 8:00 PM

Updated January 25, 2024

Site work and paving for a road / highway in Virginia City, Montana. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The project consists of providing and placing crushed top surfacing. The project begins at the intersection of Cliff-Wade Lake Road and Highway 287 and continues 9.4 miles southeast to the intersection of Horn Creek Road and State Highway 87. The base bid includes the spur road to Wade Lake. The project also includes an additive alternate to add dust palliative to the new top surfacing. The gravel surfacing will match the existing road widths which vary from 12-ft to 18-ft.

Award

Roads / Highways

$1,530,310.00

Public - County

Paving, Site Work

12

17

2

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
1
Bidding Soon
87
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 16, 2022

September 15, 2022

Project location map

Multiple Locations, Virginia City, MT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.