Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a municipal facility in Ashland, Kentucky. Completed plans call for the construction of a 3,298-square-foot, one-story above grade municipal facility; and for site work for a municipal facility.
The Boyd County Animal Shelter project will be bid and constructed using the CM Agency method of procurement, consisting of multiple bid packages. Successful bid package contractors would enter a contract directly with the Boyd County Fiscal Court, whereby Trace Creek Construction, Inc. will be serving as the Owner's agent. The project is generally described as new construction of a single story, approximately 3,298 square feet, Animal Shelter facility. Roughly 1,823 SF of the facility will contain the kennel area where there will be 25 individual kennels, the remaining spaces of the building serve as a procedure room, office, storage, cat kennels, breakroom, mechanical, restroom, and playroom space. The building will be constructed primarily of load-bearing concrete masonry units with wood-framed trusses. The official form of proposal is included within Volume One (1) of the official specification manual. The forms supplied within the specification manual shall be completely filled out and submitted within a sealed envelope. The form of proposal shall be copied from the specification manual. The exterior of the sealed envelope shall contain the following information: A 5% bid bond or certified check equal to 10% of the bid, including all alternates, is required to be submitted with the official form of proposal. A 100% payment and performance bond shall be provided for the full base bid amount plus any accepted bid alternate(s), upon receipt of a Notice of Award. The owner intends to purchase major materials for the project through purchase orders managed by the Construction Manager, which are also referred to as Direct Purchase Orders. Materials must be $5,000 or greater in value in order to be listed and considered as Direct Purchase Order item. All material cost(s) intended to be used as an Owner Direct Purchase Order shall be included in the bid amount excluding tax. Any material purchased by the contractor and paid for by the contractor shall have sales tax paid for by the contractor. Any unused amounts included within a purchase shall be retained by the Boyd County Fiscal Court. Bids will be received from Individual Trade Package Contractors on a Lump Sum Bid Basis for the Individual Trade Bid Package as described herein. All phases of the work described and outlined within the Individual Trade Bid Packages will be completed by the successful Individual Trade Bid Package Contractor. Bids shall be submitted in the manner herein described and on the official proposal form included with the general conditions and specifications and shall be subject to all the conditions as set forth and described in the Bid Documents. Kentucky Prevailing Wage Rates do not apply. The Boyd County Fiscal Court reserves the right to accept and/or reject any bid deemed to be in the best interest of the Boyd County Fiscal Court in accordance with the laws of the Commonwealth of Kentucky.
Post-Bid
Municipal
$2,000,000.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 25, 2022
October 24, 2022
1547 Fraley Lane Summit District, Ashland, KY
Related To This Project
Ashland, KY
Bid Date: Sep 15 2022
Ashland, KY
Bid Date: Jul 28 2022
Ashland, KY
Bid Date: Sep 22 2022
Ashland, KY
Bid Date: Sep 01 2022
Ashland, KY
Bid Date: Dec 01 2022
Ashland, KY
Bid Date: Mar 22 2023
Ashland, KY
Bid Date: Jan 19 2023
Ashland, KY
Bid Date: Jan 24 2023
Ashland, KY
Bid Date: Dec 10 2021
Ashland, KY
Bid Date: Aug 18 2022
Ashland, KY
Bid Date: Jan 10 2023
Ashland, KY
Bid Date: Aug 08 2022
Ashland, KY
Bid Date: Jun 02 2022
Ashland, KY
Bid Date: Jun 15 2022
Placement and Replacement of Bituminous Asphalt Material for the 2022 Street Paving Season - 4774011
Ashland, KY
Bid Date: Jul 20 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.