BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 22, 2022 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Saint Joseph, Michigan. Contact the soliciting agency for additional information.

Tiscornia Park (80 Ridgeway Dr): is a sixteen (16) acre park with beach frontage situated on the shores of Lake Michigan, offering several amenities to both visitors and residents. The beach and designated swimming area are accessed from the parking lot by several paths and trails. The park also provides parking and easy access to the iconic St. Joseph inner and outer lighthouses. Paddler Park (213 Upton Dr): is the City's newest park dedicated as such by the City Commission in April of 2021, and is a quarter (.25) acre park with frontage on the St. Joseph River. This site was occupied by the City water tower for more than 30 years before it was removed in 2010; the concrete footings on which it stood still remain. The City of St. Joseph intends to make future improvements to Tiscornia and Paddler parks, and the objective is to develop a master plan for each that will accomplish the following: 1. Provide amenities to enhance the two (2) parks to accommodate multiple recreational opportunities 2. Create non-motorized connections 3. Complement adjacent off-site uses 4. Provide means for universal access 5. Create a means for the appreciation and protection of the sites natural resources 6. Create an identity for the parks 7. Develop a logical framework for the design of the parks 8. Develop a design that strives to maximize the best use of property and space 9. Develop a design that will serve to promote the two (2) parks as community-wide destinations 10. Conduct public meetings to gain input from residents, park users, and nearby businesses Questions regarding the project may be directed to Public Works Director Greg Grothous 269- 985-0309 or ggrothous@sjcity.com. The City reserves the right to reject any and all proposals and negotiate with any source, in any manner necessary, deemed to be in the Citys best interest. The method of contractor selection has not been determined at this time.

Conceptual

Playgrounds / Parks / Athletic Fields

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
372
Active Projects
184
Bidding Soon
2,862
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2022

Project location map

Multiple Locations, Saint Joseph, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.