BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 13, 2022 at 8:00 PM

Updated October 24, 2023

Site work, paving and outdoor lighting for a mixed-use development in Tolleson, Arizona. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work consists of removal and replacement of asphalt pavement, roadway widening, curb and gutter installation, traffic signal installation, utility valve and manhole adjustments, sidewalk placement, lime/cement subrade stabilization, microsurfacing, pipe removal and installation, scupper installation, signing and marking and SRP Irrigation and lighting adjustments. No pre-bid conference is scheduled. Contract duration: 485 days Q & A deadline: Aug 09, 2022 5:00:00 PM EDT

Bid Results

Roads / Highways

$12,478,882.00

Public - County

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
38
Bidding Soon
1,138
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2022

September 23, 2022

Project location map

MC 85 & South 95th Avenue, Tolleson, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.