Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 24, 2023 at 7:00 PM
Updated January 26, 2024
Site work for a water / sewer project in Buhl, Alabama. Completed plans call for site work for a water / sewer project.
As of January 17, 2023, construction is underway and expected to be completed in 3 months. Contract A was awarded to Consolidated Pipe & Supply for $276,421.00. Contract B was awarded to Consolidated Pipe & Supply for $45,537.50. Contract C was awarded to Centerline Contracting, Inc. for $99,309.41. Total = $421,267.91 ESTIMATE: Contract A :$275,000 Contract B: $64,000 Contract C: $89,000 The Owner reserves the right to waive any informality or to reject any or all bids, and to award the contract to the lowest and most responsible bidder. All bidders must comply with requirements of the Contractor's Licensing Law of the State of Alabama and be certified for the type of work on which the proposal is submitted. Each bidder must deposit with his bid, security in the amount, form, and subject to the conditions provided in the Information for Bidders.All Contractors preparing Bids for the referenced project shall submit a list of similar projects (successfully completed) in the last two years, having the same scope of work with construction cost similar to or greater than this project. All nonresident contractors preparing bids shall submit with the bid documents evidence of a current Alabama General Contractor's License, evidence (with original seal of the State of Alabama) of proper registration with the Alabama Secretary of State as a foreign corporation, and a Certificate of Good Standing as a Foreign Corporation from the State of Alabama Department of Revenue. Bids submitted by a nonresident contractor without these documents included will be rejected. No bidder may withdraw his bid within sixty (60) days after the opening thereof. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.
Under Construction
Water / Sewer
$421,268.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
24
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
