BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 22, 2022 at 8:00 PM

Updated September 14, 2023

Site work, paving and outdoor lighting for a mixed-use development in Sacramento, California. Conceptual plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

The anticipated total project budget for the Bowling Green Park -- Clean California Grant Project (including hard costs, soft costs, contingency, etc.) is anticipated to be approximately $1,127,313. Grant funding for this project must be expended by March 1, 2024, which means the construction of project improvements must be substantially completed including time for project closeout and final billing.ry Harkins, Landscape Architect, email is the preferred method of contact. Do not contact other District personnel or selection committee members regarding this project or the selection procedures. The consultant will be responsible for meeting the District's goals of creating parks that are attractive and can accommodate active recreation. The task and services for this project cover all phases of the project and the consultant team will prepare contract documents, associated exhibits, technical specifications, and cost estimates for this project. Park improvements and renovations must comply with the requirements and criteria specified in the Clean California grant, California Building Code (latest edition), and Sacramento improvement and construction standards (latest edition). The following consultant services will be required for this project: civil engineering, electrical engineering, geotechnical engineering, and structural engineering. The consultant will be responsible for ensuring that their work is completed on schedule and within the project budget. Question Deadline 08/12/2022 at 5:00 PM PT The method of contractor selection has not been determined at this time.

Conceptual

Playgrounds / Parks / Athletic Fields

$1,127,313.00

Public - City

Outdoor Lighting, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
409
Active Projects
131
Bidding Soon
2,999
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2023

Project location map

4125 49th Ave, Sacramento, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.