Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Twinsburg, Ohio. Completed plans call for site work for a water / sewer project.
As of 8/24/2022 This project will be rebid at a later date due to the bids being over 10% or more of the engineers estimate. Storm Sewer Lining The method of Contractor Selection has not been Determined at this time. Engineer's Estimate is $550,000 The work included in this project generally includes the televising, cleaning and lining of a 48" x 60" galvanized elliptical storm sewer with a UV Cured in place GRFP Liner. All proposed work shall meet all City, EPA requirements and ordinances of which the Contractor shall become familiar with. All storm service connections shall be located and properly maintained. This linear work shall start at the downstream end and work in the upstream direction. The trunk sewer begins at the main Gleneagles Golf Course Pond, down Hawkins to the rear yards and turns toward Glenwood Drive. The section being lined begins at Glenwood Drive and empties into a pond located on the golf course hole #3 and is located in an easement between Orin and Framingham Lane. It is anticipated both ponds will require dewatering to a level that allows work to proceed. A siphon system for dewatering the main pond at the outlet on Timothy Lane is recommended, as it can provide the lowering over night with no noise related to a generator. Lake 3 on the golf course may require more traditional pumping if a siphon system cannot be implemented due to geometry, however siphon systems are preferred due to noise reduction. The Contractor must maintain positive drainage in the project area at all times and will schedule his work accordingly to insure that storm water will be draining to prevent ponding, erosion, and flooding. Keeping mud/construction debris off the pavement will be a high priority. Safety will not be compromised. In the event City personnel are called out responding to a flooding event, accumulated mud on the pavement, or other emergency/safety situation, the Contractor will be responsible for all expenses incurred by City personnel and equipment. Bid Security: 10% Performance Bond: 100% Payment Bond: 100% Maintenance Bond: 10% Prevailing Wage Rate Requirement: YES Begin Project Date: October 24, 2022 Project Completion Date: December 15, 2022 all liquidated damages in the amount of $1,000.00 per calendar day imposed by the City for my company failing to start project on time, providing submittals as stated herein or not finishing Contract work by the Completion date or meeting all interim dates.
Award
Water / Sewer
$389,875.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 13, 2022
October 24, 2022
Multiple Locations, Twinsburg, OH
Related To This Project
Twinsburg, OH
Bid Date: Sep 08 2022
Twinsburg, OH
--
Twinsburg, OH
Bid Date: Nov 14 2024
Twinsburg, OH
Bid Date: Feb 02 2023
Twinsburg, OH
Bid Date: Feb 09 2023
Twinsburg, OH
Bid Date: Feb 23 2023
Twinsburg, OH
Bid Date: Feb 23 2023
Twinsburg, OH
--
Twinsburg, OH
Bid Date: Sep 16 2022
Twinsburg, OH
--
Twinsburg, OH
--
Twinsburg, OH
Bid Date: Aug 16 2022
Twinsburg, OH
--
Twinsburg, OH
Bid Date: Aug 16 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.