EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 9, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a bridge / tunnel in Fort St. John, British Columbia. Conceptual plans call for site work for a bridge / tunnel.

The project includes rehabilitation of bridge deck and other miscellaneous bridge repairs at five different bridge structures along the Alaska Highway: Jackfish Creek Bridge located at Km 424.8 of the Alaska Highway, Toad River Bridge located at Km 671.7, Lower Liard Bridge located at Km 763.3, Coal River Bridge located at Km 823.3, and Hyland River Bridge located at Km 937.3. All five bridges are located between Fort St. John, BC and Watson Lake, YK. The work under this contract generally comprises of the following but is not limited to: Project Management. Supply and maintain of all traffic control for the duration of the works. Quality Management. Removal and disposal of delaminated concrete and preparation of the concrete surface (by hydrodemolition only). Concrete supply, install, and cure of bridge deck. Maintenance of joints. Miscellaneous bridge repairs such as crack repair and joint caulking replacement. Surveys (construction layout, payment quantities, as-built survey, and others as required). Environmental protection. TIMELINE: Tender was cancelled. To assist with bonding and insurance requirements, this project is estimated to cost between $1,000,001 and $5,000,000.

Project Abandoned

Bridges / Tunnels

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
0
Bidding Soon
20
All Active Projects
11
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2022

January 31, 2024

img_map_placeholder

Multiple Locations, Fort St. John, BC

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.