BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in Marine Corps Air Station Cherry Point, North Carolina. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Project No.: 7217368 (Clauses incorporated in Base Contract apply to this solicitation) Title: CP2304M Repairs to Waste Water Treatment Plant NAICS Code and Standard Size: 236220, Commercial and Institutional Building Construction, $39.5 Million Contract Completion Date: All work shall be completed within 555 calendar days after award Estimated Cost Range: More than $10,000,000 Wage Determination: General Decision NC20220069 02/25/2022 Liquidated Damages: $2,086.00 per calendar day of delay Basis for Award: Lowest Price Proposal Acceptance Period: 90 days after receipt of proposal Site Visit: 27 July 2022 @ 10:00 AM Contractors are to meet at the FEAD office, Building 87, MCAS Cherry Point This will be the ONLY Government Scheduled Site Visit for this Project. FAR 52.217-5 Evaluation of Options (Jul 1990) Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s). Bond Requirements: Bid bonds are required in accordance with FAR 28.101-1. An electronic copy of your bid bond must be submitted with your proposal. A hard copy of your bid bond will be requested from the apparent low upon confirmation of their price and must be submitted to the FEAD office within one (1) business day from time of request. Failure to submit an electronic copy of your bid bond with your proposal will result in your proposal being deemed nonresponsive and your proposal removed from consideration. In accordance with FAR Clause 52.228-15 Performance and Payment Bonds--Construction and FAR Clause 52.228-13 Alternate Payment Protections, Payment and/or performance bond(s) will be requested at the time of award. o No bonds are required for proposals less than $35K. o Proposals valued at $35K and greater will require a payment bond only. o Proposals valued at $150K and greater will require a bid bond, a payment bond, and a performance bond. CP2304M REPAIRS TO WASTE WATER TREATMENT PLANT Solicitation No. N400857217368 Project No. 7217368 MCAS Cherry Point, North Carolina FAR Clause 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 is applicable for this solicitation. Contractors are required to submit their pricing on the Supplementary Instructions to Offerors or their proposal will be considered non-responsive. Proposal Due Date/Time: 20 October 2022, 1200 local time E-Mail Address for Proposals and Requests for information (RFIs): 1. roicc_chpt_ktr_bids@navy.mil 2. linda.b.clark14.civ@us.navy.mil 3. ericka.j.bishop.civ@us.navy.mil *Note: Proposals must be sent to ALL of the above email addresses OR hand delivered by the date and time listed above. Requests for Information (RFIs): RFIs must be submitted email addresses above. The cut off for RFIs is 10 October 2022 by 0900 in order to process all inquiries by the proposal due date. The specifications and drawings are posted as attachments on SAM.gov. NOTE THE FOLLOWING: The Government intends to evaluate proposals and issue a task order without discussions. Therefore, each initial offer should contain the offeror's best terms from a price standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. Any changes to the Scope of work, Technical Specifications, or Drawings will be issued on a Standard Form (SF) 30. This request does not constitute a notice to proceed nor shall it be considered as a commitment on the part of the Government. Any cost incurred prior to issuance of a task order cannot be reimbursed. Offerors will not be reimbursed for any effort or proposal costs resulting from this solicitation. Offerors are advised that funding may not become available. If funds are not available, no award will be made as a result of this solicitation. If funding becomes available, the successful offeror will be issued a task order under their contract, as set forth in DFARS 252.216-7006, Ordering (May 2011).

Post-Bid

Water / Sewer

$10,000,000.00

Public - Federal

Renovation, Site Work

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
46
Bidding Soon
584
All Active Projects
268
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 26, 2022

December 27, 2022

July 4, 2024

img_map_placeholder

To Be Determined, Marine Corps Air Station Cherry Point, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.