BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Williams, Arizona. Completed plans call for site work for a municipal facility.

Award Details Contract Award Date: Sep 06, 2022 Contract Award Number: 127EAX22C0029 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: ND1XQAKA3GL1 Contractor Awarded Name: NOLAND TOUGH FENCE, LLC Contractor Awarded Address: Humboldt, AZ 86329 USA Base and All Options Value (Total Contract Value): $134540.00 SOUTH ZONE FENCE REMOVAL AND CONSTRUCTION - KAIBAB NATIONAL FOREST MAGNITUDE OF THIS PROJECT IS BETWEEN $100,000 AND $250,000 THIS ACQUISITION IS A TOTAL SMALL BUSINESS SET-ASIDE NAICS CODE: 238990 DAVIS-BACON WAGES APPLY - SEE ATTACHED WAGE DETERMINATION SUBMIT QUESTIONS BY JULY 27, 2022 TO: michael.carico@usda.gov DUE DATE FOR SUBMISSION OF QUOTES: AUG 03, 2022 AT 08:00 MST QUOTES SHOULD BE SUBMITTED ELECTRONICALLY TO: michael.carico@usda.gov VENDORS MUST BE REGISTERED IN THE SYSTEM FOR AWARD MANAGEMENT (SAM) (WWW.SAM.GOV) TO BE ELIGIBLE FOR AWARD OF A FEDERAL CONTRACT (NOTE: REGISTRATION IS FREE ON THIS GOVERNMENT SITE) IF AWARDED A CONTRACT, VENDOR MUST BE ABLE TO START PROJECT IMMEDIATELY BONDS ARE REQUIRED IN ACCORDANCE WITH 12 BELOW Delivery: 100 Days After Notice to Proceed Delivery Location Code: 8156 KAIBAB NATIONAL FOREST 800 SOUTH 6TH STREET WILLIAMS AZ 86046 US 0001 Kaibab South Zone Fence Removal & Construction - SEE SCHEDULE Statement of Work/Specifications. (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J. 452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract. D - SECTION D - Packaging and Marking E - SECTION E - Inspection and Acceptance 52.246-1 Contractor Inspection Requirements. (APR 1984) 52.246-12 Inspection of Construction. (AUG 1996) (a) Definition. Work includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components. (b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract. (C) Government inspections and tests are for the sole benefit of the Government and do not - (1) Relieve the Contractor of responsibility for providing adequate quality control measures; Solicitation No. 127EAX22Q0032 Page 7 of 42 Kaibab South Zone Fence Removal and Construction (2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance; (3) Constitute or imply acceptance; or (4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) below. (d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization. (C) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract. (f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises. (g) If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed. (h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time. Annual Representations and Certifications. (MAR 2020) (a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238990. (2) The small business size standard is $16.5M. (3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees. (b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies. Period of Performance: The time period for the fence installation is: July 25- October 31, 2022 Forest closure may potentially occur due to fire conditions. Project Components: Heavy Fence Maintenance This would be a fence that is not old enough or in disrepair enough to replace but that has not been maintained for some time and will require cutting several trees off the fence, splicing several broken wires, replacing several stays and posts and possibly some braces, and tightening the fence up. When the bottom wire is in need of replacement, barbless wire shall be used. Fence Re-Construction This is a fence re-constructed to Forest Service specifications. Fence Roll-up and Removal Roll up and remove from FS lands all old fence material that can no longer be used. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Municipal

$134,540.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
6
Bidding Soon
106
All Active Projects
48
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 3, 2022

September 2, 2022

img_map_placeholder

800 S 6th St, Williams, AZ


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.