BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 16, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a road / highway in Fall Creek, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Chip Seal Coating Village of Fall Creek The Village of Fall Creek is seeking sealed bids for Crack Seal and Chip Seal Coating of approximately 4000 feet total, width 30 feet. Road to be sealed is Liberty. Contractor to verify road width and length. Resurfacing work is to be coordinated with Village Administrator and must be completed by October 31, 2022. The Village of Fall Creek reserves the right to reject any and all bids or portion thereof.

Post-Bid

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
25
Bidding Soon
439
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2022

September 8, 2022

Project location map

Multiple Locations, Fall Creek, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.