BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Belmont, California. Completed plans call for site work for a water / sewer project.

**As of April 18, 2023, project was awarded to Brannon Corporation but awarded amount is not available.** For public project construction described as: San Juan Sewer Pump Station Slope Repair Project 2019-579. The public project construction is more specifically defined in the Contract Documents, but generally includes the following items of work: The proposed work includes the installation of a retaining wall and native vegetation restoration to stabilize the failed bank below the San Juan Pump Station. It is the bidder's responsibility to ensure that its bid package is duly delivered. Bidders are solely responsible for the cost of preparing their bids. No bidder may withdraw its bid for a period 60 days after the date set for bid opening, except as provided in Public Contract Code Section 5101 et seq. The Engineers estimated total construction cost for this Contract is $268,958 for work to be done by contractor. This estimate is intended to serve merely as a guideline of the magnitude of work. Neither the bidders nor the contractor shall be entitled to claims because of any inaccuracy in the estimated cost range. The construction Work is to be completed within a total of 35 working days after the date specified in the City's Notice To Proceed. The City will assess liquidated damages in the amount of $4,000 for each and every working day of delay in finishing the work in excess of the contract time. Under Business & Professions Code Section 7028.15 and Public Contract Code Section 3300, all bidders must possess proper licenses for the performance of the work contemplated by the Project. Failure to possess the specified license(s) at the time of award will render the bid non-responsive. Contractors must possess a valid California class A, contractors license for this contract. Firms bidding as a joint venture must secure a joint venture license before award of this contract. Bid security in the amount of ten percent (10%) of the Bid Amount must accompany the Bid in accordance with Public Contract Code Section 20170. After award of the contract, the successful bidder must provide security for faithful performance and labor and materials (payment bond) as well as proof of insurance, in accordance with the requirements set forth in the Contract Documents. Bonds must be executed by a surety possessing a valid certificate of authority issued by the California Department of Insurance. At the request and expense of the Contractor to whom the Contract is awarded, securities in a form approved by the City will be permitted in substitution for money withheld by the City to ensure performance under the Contract, as provided in Public Contract Code Section 22300. This project is a public work under Labor Code Section 1770, et seq., and the successful bidder will be required to comply with certain labor standards and employment requirements including payment of the prevailing wage rates in effect on the date this Invitation for Sealed Bids was first published. Copies of the prevailing wage rates can be viewed at: portal and are on file with the Engineer at the address identified below, and shall be made available to any interested party upon request. For Davis Bacon Act Wages see Appendix D. INQUIRIES: If any bidder has questions regarding this Project, contact the Engineer: Nima Mazhari Assistant Civil Engineer, 1 Twin Pines Ln, Belmont, CA 94002 (650) 730-5706 NMazhari@belmont.gov. Any questions addressing the interpretation or clarification of the Contract Documents shall be in writing. The City reserves the right, in its sole discretion, to reject any or all Bids, to waive minor irregularities or defects in bidding and to reject nonconforming, nonresponsive or conditional bids. The Engineer's estimated total construction cost for this Contract is $375,000 for work to be done by contractor.

Award

Water / Sewer

$375,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
81
Bidding Soon
1,698
All Active Projects
707
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2023

April 17, 2023

img_map_placeholder

3228 E Laurel Creek Rd, Belmont, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.