BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in West Kelowna, British Columbia. Completed plans call for site work for a bridge / tunnel; sidewalk / parking lot; and water / sewer project.

The Regional District’s Mission Creek Greenway Regional Park was damaged during the 2022 Spring Freshet along Mission Creek, and requires repairs to the Mission Creek Greenway Trail and Right Bank Bridge Abutment Protection Works at all three bridges (Friends, Cedars, and Smoothing Stones). The works need to be completed in accordance with environmental regulations, best management practices, and the environmental management plan. The works to be completed are considered to be “emergency” works and are required to be completed within the fisheries timing windows for Mission Creek. Through this Request for Proposals, the Regional District of Central Okanagan invites Proposals for the construction, supply and installation of the following: Construction of a temporary access along the section of Mission Creek Greenway leading to the Cedars Bridge, including a repair of a trail washout, temporary removal of four (4) boardwalks, placement of geofabric, and placement of gravel to construct a temporary construction access which will be removed upon completion of work. Repair of abutment protection works and placement of streambank protection works along Mission Creek at the Mission Creek Greenway Regional Park Cedars Bridge located on the right bank. Works will be completed in two phases: Phase 1 includes construction of a temporary access to site; and, Phase 2 includes in-stream abutment and streambank protection works. Repair of abutment protection works along Mission Creek at the Mission Creek Greenway Regional Park Friends Bridge located on the right bank. Repair of abutment protection works along Mission Creek at the Mission Creek Greenway Regional Park Smoothing Stones Bridge located on the right bank. Bank restoration of undercut trail North of Cedars Bridge. Restoration will be completed by sloping the bank to remove undercut and installing large woody debris. Material will be sourced on site and installed at the engineer’s direction. Contract Time: The following are key milestone dates required for the Work: The Work may commence anytime after: August 7, 2022 (commencement of in-stream work window). Substantial Performance of the Work and all in-stream works must be achieved no later than: August 23, 2022 (end of in-stream work window) Total Performance of the Work must be achieved no later than 20 calendar days following Substantial Performance. Location: The Place of the Work is along Mission Creek Greenway, as detailed further in Part A. Documents can be obtained from https://rdco.bidsandtenders.ca/

Award

Bridges / Tunnels

$123,470.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
9
Bidding Soon
166
All Active Projects
76
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2022

August 8, 2022

img_map_placeholder

along Mission Creek Greenway, West Kelowna, BC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.