Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 6, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in West Kelowna, British Columbia. Completed plans call for site work for a wastewater treatment plant.

To restore a section of the driveway at the Westside Regional Wastewater Treatment Plant (WWTP) located at 4261 Gellatly Road. South, West Kelowna BC. Scope of Work: i) Area A – Patch by Biofilter Area (see Exhibit 1 photographs) Work shall include the following: Area of work is approx 3.4 meters long by approx. 4.4 meters wide. Remove (rip-out) and dispose of existing asphalt at identified areas Grade down base Apply 4” packed crush Apply weed killer Apply SSI (adhesive) to face of existing asphalt Apply 4” asphalt packed to make flush to old/existing asphalt. ii) Area B – Patch by UV Building (see Exhibit 2 photographs) Work shall include the following: Area of work is approx. 4.8 meters x 4.0 meters Clean up edges Grade down base Apply 4” packed crush Apply weed killer Apply SSI (adhesive) to face of existing asphalt Apply 4” asphalt packed to make flush to old/existing asphalt. iii) Area C – Patch by Primary Clarifier (see Exhibit 3 photographs) Work shall include the following: Area of work is approx. 4.4 meters x 3.6 meters Clean up edges – cut to make a clean edge if needed Grade down base Apply 4” packed crush Apply weed killer Apply SSI (adhesive) to face of existing asphalt Apply 4” asphalt packed to make flush to old/existing asphalt. iv) Area D – Patch by Fermenter (see Exhibit 4 photographs) Work shall include the following: Area of work is approx. 0.9 meters x 3.5 meters Clean up edges – cut to make a clean edge if needed Grade down base Apply 4” packed crush Apply weed killer Apply SSI (adhesive) to face of existing asphalt Apply 4” asphalt packed to make flush to old/existing asphalt. v) Area E – Main Driveway (see Exhibit 5 photographs) Work shall include the following: Area of work is approx. 6.8 meters x 34.0 meters Clean up edges – cut to make a clean edge if needed Grade down base Apply 4” packed crush Apply weed killer Apply SSI (adhesive) to face of existing asphalt Apply 4” asphalt packed to make flush to old/existing asphalt. vi) Area F – Patch by mailbox at top of driveway (see Exhibit 6 photographs) Work shall include the following: Area of work is approx. 3.2 meters x 1.3 meters Clean up edges – cut to make a clean edge if needed Grade down base Apply 4” packed crush Apply weed killer Apply SSI (adhesive) to face of existing asphalt Apply 4” asphalt packed to make flush to old/existing asphalt. Documents can be obtained from https://rdco.bidsandtenders.ca/

Award

Water / Sewer

$20,288.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
13
Bidding Soon
271
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2023

October 23, 2023

Project location map

4261 Gellatly Rd S, West Kelowna, BC


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed