Published September 3, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of a military facility in Columbus, Ohio. Completed plans call for the renovation of a military facility.

The Defense Logistics Agency, Defense Supply Center/DLA Land and Maritime, Columbus Ohio has a requirement for Safety Improvements located at the Defense Supply Center Columbus, Ohio. This procurement is issued as a 100% small business set aside. The NAICS for this requirement is 238220. The Small Business size standard for this requirement is $16,500,000.00. The award will be a firm fixed contract. Award will be based on the lowest evaluated price of the technically acceptable proposal meeting all of the solicitation requirements from responsible offerors with acceptable past performance. There will be one award made for this project. Award may be made without discussions. The following summary is for the purpose of general information and is not intended to include or describe every feature or item or to define the scope of work. It is expected that prospective contractors will attend the site visit, review solicitation documents, and thoroughly familiarize themselves with the project prior to submitting a proposal. PROJECT SCOPE INFORMATION: The contractor shall furnish all plant, labor, equipment, materials, supplies, testing and supervision required in performing all operations in conjunction with this project in strict accordance with the specifications (CSC-20049 (Water Heater (Solar) Improvements Bldg 11) , contract drawing No. 4-584, complete and subject to the terms and provisions of this contract. Contractor shall perform the following work to complete this project. CONTRACT DRAWINGS: The contract drawings indicate the extent and general arrangement of the existing facilities, new work, materials and equipment installations. If any departures from the contract drawings, other than minor adjustments, are deemed necessary by the Contractor, details of such departures and the reasons therefore shall be submitted to the Contracting Officer or their authorized representatives soon as practicable for approval. No such departures shall be made without the written approval of the Contracting Officer. BASIS OF AWARD: The Government will make the award based on the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors. Note that offers that are not technically acceptable cannot be selected, regardless of price. Selection of an offeror for contract award will be made on the basis of an assessment of each offeror's response to the Request for Proposal (RFP). As a Request for Proposals (RFP) based on Lowest Price Technically Acceptable (LPTA) Source Selection Process, in accordance with Federal Acquisition Regulation (FAR) Part 15.101-2, the Government will make the award based on the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors. The THREE (3) evaluation factors for determination of technical acceptability consist of: 1. Past Performance; 2. Technical Construction Capability; and 3. Technical Qualifications of Proposed Staffing. Offerors submitting proposals must comply with the requirement to provide information detailed in solicitation Sections L and M - DOCUMENTATION OF TECHNICAL ACCEPTABILITY with their proposals. NOTE: Failure to comply with the RFP requirements will raise serious questions regarding an Offeror's technical ability to perform the services and may be grounds to eliminate the proposal from further consideration for contract award. Details of workmanship shall be in accordance with the highest standards and best practices of the respective trade as recognized by respective contractor's association. Only qualified tradesmen or mechanics shall be assigned to do the work required by this contract. At no time shall the work be accomplished by apprentices or laborers without the supervision of a journeyman or higher level supervision. Contractor personnel will not require a secret clearance. The contract will be required by law to pay prevailing Davis Bacon Act wage rates for all work awarded under the contract. The Defense Supply Center Columbus is located in Franklin County, Ohio. PERIOD OF PERFORMANCE: All work associated with the performance of this project must be completed within 540 calendar days after issuance of the Notice to Proceed. One preproposal conference/site visit is scheduled for this project and is scheduled for 10:00 AM local time on 01 August 2022. All individuals wishing to attend will be required to request Center access no later than 72 hours prior to the site visit date. Additionally, in order for one to be allowed on DSCC, he she must have a badge, or submit his or her information, via the DBIDS Pre-enrollment site. It breaks down to a two-step process. Step 1: follow this URL and complete the questions, a confirmation code will be generated; and DBIDS Pre-Enrollment (dmdc.mil) Step 2: Send me the confirmation code. Once I receive the confirmation code, I can submit your visitor badge request to Pass & ID. Your Visitor Badges will need to be picked up the morning of the meeting (03 FEB), from the Visitor Center (Pass & ID). I don't know how familiar you are with DSCC, but sometimes search engines direct people to the old front gate. Visitor Center Address: 401 N. Yearling Road Columbus, OH 43213 Those individuals wishing to attend must provide their name and corporate affiliation alone with the DIBS code provided to William.Hurley@dla.mil by email. The Defense Supply Center is a secure facility and individuals who do not preregister will not be granted access. Registered participants cannot bring unregistered personnel on center with them. Individuals will need to enter the Center through the Visitor Processing Center located at the DSCC Main Entrance, 401 N. Yearling Road, Whitehall, OH 43213. Valid federal or state issued photo identification will be required. Anyone attempting to use state issued identification from any state not in compliance with the Real ID Act of 2005 will be denied access to the DSCC Center. Beginning on January 30, 2017 certain state ID's may not be accepted for access to DSCC due to non-compliance of the Real ID Act of 2005. The Real ID Act of 2005 and Department of Homeland Security (DHS) Guidance (lead for REAL ID enforcement) prohibits Federal agencies (includes DoD) from accepting drivers' licenses and state identification cards from non-compliant states. The Act was enacted to implement the 9/11 Commission's recommendation that the Federal Government "set standards for the issuance...of sources of identification, such as driver's licenses." It established minimum security standards for license issuance and production and assigned responsibility for determining whether a state is meeting these standards to the Department of Homeland Security (DHS). For more information on the Real Act of 2005 and a list of compliant and non-compliant states please go to the following DHS website: https://www.dhs.gov/current-status-states-territories. Questions concerning this requirement must be submitted no later than 11:00 AM local time on 8 August 2022. The solicitation will close at 1:00 PM (Eastern) on 22 August 2022. MAGNITUDE OF THIS CONSTRUCTION PROJECT IN TERMS OF ESTIMATED COST: ( ) This Project is estimated less than $25,000. ( ) This Project is estimated between $25,000 and $100,000. ( ) This Project is estimated between $100,000 and $250,000 . ( ) This Project is estimated between $250,000 and $500,000 . ( ) This Project is estimated between $500,000 and $1,000,000 . (X) This Project is estimated between $1,000,000 and $5,000,000 . ( ) This Project is estimated between $5,000,000 and $10,000,000. ( ) More than $10,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$10,000,000.00

Public - Federal

Renovation

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Quality Assurance, Installer Qualifications, Field Samples, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Construction Facilities, Temporary Construction, Temporary Controls, Temporary Environmental Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Maintenance Data, Bonds, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Concrete Curing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Exterior Insulation and Finish Systems, Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels, Siding, Roof and Wall Specialties and Accessories, Roof Accessories, Relief Vents, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Panel Doors, Windows, Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Key and Card Control Units, Commercial Equipment, Office Equipment, Computers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furniture, Multiple Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools, Integrated Construction
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Sanitary Sewerage, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, Air Outlets and Inlets, Central Heating Equipment, Heat Exchangers for HVAC, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Instrumentation and Control for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Clamps, Hooks, Lifts, Manufacturing Equipment, Assembly and Testing Equipment, Applicators
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment, Packaged Water Treatment, Packaged Water Treatment Plants

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
72
Bidding Soon
1,136
All Active Projects
465
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

CSC-20049 Water Heater (Solar) Improvements Building 11

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.