BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 15, 2022 at 7:00 PM

Updated January 26, 2024

Site work and paving for a sidewalk / parking lot in Burlington, Iowa. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

2022 ADA Improvement Project - 2nd Letting. This years project focuses around Corse School and the surrounding area. Major line items for this project include Concrete Curb and Gutter, 4 Sidewalk, 6 Sidewalk, and Detectable Warnings. All work is to be done in accordance with the specifications which are now on file in the office of the City Clerk. Said plans and specifications and the proceedings of the City Council in connection with this proposed improvement are hereby made a part of this notice by reference. A certified check or bid bond in the amount of 5% of the total bid drawn on a solvent bank, made payable to the City Treasurer, shall be filed with each bid. This check or bond may be cashed and the proceeds retained by the City as liquidated damages if the bidder fails to execute a contract and file an approved bond for the faithful performance thereof within 5 days after the acceptance of the bid. The successful bidder will be required to furnish a payment and performance bond(s) in an amount equal to One Hundred Percent (100%) of the contract price; said bond(s) to be issued by a responsible surety approved by the City Council, and shall guarantee the faithful performance of the contract and the terms and conditions therein contained, and shall guarantee the prompt payment for all materials and labor, and protect and save harmless the City from all claims and damages of any kind caused by the operations of the contractor. The contractor shall also provide a maintenance bond warranting all workmanship and materials for a period of 2 years from and after the acceptance of the work by the Burlington City Council. The maintenance bond may be provided in the form of a combination performance, payment and maintenance bond or in the form of a separate bond from the payment and performance bond(s) in an amount equal to the contract award. Each bid shall be made on a form furnished by the City and shall be sealed in an envelope separate from the envelope containing the certified check or bid bond. The late start date for this project shall be April 1, 2023, and shall be completed no later than 60 Working Days. The City reserves the right to waive technicalities and the right to reject any or all proposals or division thereof.

Bid Results

Sidewalks / Parking Lot

$164,139.00

Public - City

Paving, Site Work

37

3

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
63
Bidding Soon
856
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 8, 2022

April 1, 2023

Project location map

Multiple Locations, Burlington, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.