BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Milford, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Work to Be Done: Division No.1 Work generally consists of 26 S.Y. of Subbase, Modified, 6"; 7 EA of Manhole Adjustment, Minor; 26 S.Y. of Pavement Removal; 1 L.S. of Temporary Traffic Control; 1 L.S. of Mobilization; 26 S.Y. of Manhole Boxouts. Division No. 2 Work generally consists of 127 S.Y. of Subbase, Modified, 2"; 76 L.F. of Storm Sewer, Trenched, 2000D RCP, 12"; 80 L.F. of Removal of Storm Sewer, HDPE/PVC, <36" DIA.; 1 EA of Manhole, Circular Storm Sewer, SW-401, 48 IN; 60 L.F. of Curb and Gutter, 2.5'x2"; 11 S.Y. of Removal of Sidewalk; 60 L.F. of Removal of Curb; 11 S.Y. of Sidewalk, PCC, 5"; 103 S.Y. of Driveway, Granular; 100 S.Y. of Full Depth Patch, HMA; 100 S.Y. of Pavement Removal; 1 L.S. of Temporary Traffic Control; 1 L.S. of Mobilization; 2 EA of Special Pipe Connection. Division No.3 Work generally consists of 19 S.Y. of Subbase, Modified, 2"; 1 EA of Intake Adjustment, Minor; 19 L.F. of Curb and Gutter, 2.5'x6"; 19 L.F. of Removal of Curb; 13 S.Y. of Full Depth Patch; 18 S.Y. of Pavement Removal; 1 L.S. of Temporary Traffic Control; 1 L.S. of Mobilization. Division No. 4 Work generally consist of 10 C.Y. of Topsoil, On-Site; 120 S.Y. of Subbase, Modified 2"; 190 S.Y. of Subbase, Modified, 6"; 6 L.F. of Storm Sewer, Trenched, 2000D RCP, 15"; 4 L.F. of Removal of Storm Sewer, RCP, < 36"; 90 S.Y. of Removal of Sidewalk; 25 S.Y. of Removal of Driveways, PCC; 66 S.Y. of Sidewalk, PCC, 5"; 29 S.Y. of Sidewalk, PCC, 6"; 190 S.Y. of Full Depth Patches; 190 S.Y. of Pavement Removal; 0.4 STA of Painted Pavement Markings, Solvent/Waterborne; 1 L.S. of Temporary Traffic Control; 1 L.S. of Convectional Seeding, Seeding, Fertilizing, and Mulching; 25 L.F. of Filter Sock; 25 L.F. of Filter Sock, Removal; 1 L.S. of Mobilization; 1 L.S. of Repair, Storm Sewer Pipe; 4 EA of Patch Subdrain.

Post-Bid

Water / Sewer

$126,037.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
18
Bidding Soon
196
All Active Projects
78
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2022

November 21, 2022

img_map_placeholder

Multiple Locations, Milford, IA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.