Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 16, 2022 at 7:00 PM
Updated February 14, 2024
Site work and paving for a mixed-use development in Milford, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Work to Be Done: Work generally consists of: Clearing and Grubbing Topsoil, On-Site Excavation, Class 10 Excavation, Class 10, Borrow Subgrade Preparation, 12 Subbase, Modified, 2 Removal of Sidewalk Removal of Shared Use Path Removal of Driveway Shared Use Path, PCC, 5 Special Subgrade Preparation for Shared Use Path, 12Sidewalk, PCC, 5Detectable Warnings Driveway, Paved, PCC, 6 Driveway, Granular Temporary Traffic Control Conventional Seeding, Seeding, Fertilizing, and Hydro-Mulching Filter Sock Filter Sock, Removal of Device Silt Fence or Silt Fence Ditch Check Silt Fence or Silt Fence Ditch Check, Removal of Sediment Silt Fence or Silt Fence Ditch Check, Removal of Device Stabilized Construction Entrance Remove and Reinstallation of Existing Fence Mobilization Remove and Reinstall Signs Trail Signs Remove Wood Bollards. A certified check or a bid bond of a reputable bonding company authorized to do business in the State of Iowa in an amount not less than ten percent (10%) of the total amount of the bid shall be included in a separate sealed envelope, plainly marked bid bond. The bid guarantee shall be forfeited as liquidated damages if the successful bidder fails proper execution Performance and Payment Bonds: The successful bidder must execute performance and payment bonds, each in an amount equal to one hundred (100%) percent of the contract amount to ensure a timely, efficient, and complete performance. The bonds shall be issued from a reputable bonding company authorized to do business in the State of Iowa. Liquidated Damages: Liquidated damages will be assessed the contractor in the amount of five hundred dollars ($500.00) per working day that the work remains uncompleted after the end of the contract period with due allowances for extensions due to conditions beyond the control of the contractor You may download the digital plan documents at no charge by inputting Quest project #8339698 on the portal. Work Shall be substantially completed within 20 working days. All work shall be completed by June 30, 2023 Site Directions: 500 feet east of the intersection of Highway 71 and 202nd St on the south side of the road in Milford, IA
Award
Roads / Highways
$85,566.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
