BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a clubhouse / community center in Ontario, California. Completed plans call for the renovation of a clubhouse / community center.

Online Q&A Yes Q&A Deadline 08/03/2022 8:00 AM (PDT) Bid Valid-90 Calendar Days Liquidated Damages-150.00 Start/Delivery Date Within 2 weeks of receiving PO Project Duration 60 days Each Bid shall be accompanied by cash, a certified or cashier's check, or Bid Bond secured from a surety company satisfactory to the City, the amount of which shall not be less than ten percent (10%) of the submitted Total Bid Price, made payable to City of Ontario as Bid Guarantee. The Bid Guarantee must be submitted in hard copy directly to the City prior to the specified date and time for bid opening as set forth in the Instructions to Bidders. SCOPE OF WORK 1.1 Location of the Project. A. Armstrong Community Center - 1265 S Palmetto Ave Ontario, Ca 91762 - Interior Painting Only. Install Magnetic dry erase sheet panels in the Conference Room east side wall. Install clear 1" corner guards. B. Senior Center - 225 E "B" St Ontario CA 91764 - Interior Painting Only - Main corridor, Classrooms, Pool Room, Offices, Kitchen, Multipurpose room, Utility Rooms, Gym, and Restrooms. Corner Guards to remain in place. Install 1" corner guard in the kitchen Area C. Dorothy A. Quesada Community Center- 1010 S Bon View Ontario, Ca 91761 - Interior painting of the tot room and hallway. D. Euclid Median Light Fixtures - Holt Ave to 10 Frwy - Paint 35 King Standard Lights (Black). Paint 8 additional Standard lights next to the Gazebo on C st and Euclid. 1.2 Scope of Work. A. The Scope of Work consists of the following: 1. Furnish at the above locations all labor, materials, tools, equipment, supervision, required insurance documents to complete that task at hand. A) Interior Painting "of all painted surfaces" which includes fixing old repairs, sanding, patching, texturing, primer 1 coat and 2 coats of paint. B) Removal and reinstallation of door bumpers C) Paint painted ceilings D) Paint painted door frames and painted doors E) Remove, transport, return and reinstall office furniture, program related boards, and furnishings F) Existing corner guards to be removed and replaced with new guards 1" clear G) Color to match existing except at Armstrong Center. Color will be determined three weeks prior to starting the project. H) City has an agreement with Dunn Edwards Paint 2401 S Vineyard Ave, Ontario Ca 91761

Bid Results

Clubhouse / Community Centers

$68,500.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
204
Active Projects
116
Bidding Soon
2,179
All Active Projects
1,010
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2022

September 12, 2022

img_map_placeholder

Multiple Locations, Ontario, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.