Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a municipal facility in Salida, Colorado. Completed plans call for site work for a municipal facility.
The Contractor shall be responsible for the 2022 Phase 2 Expansion construction work consisting of and limited to: 1) installation of geosynthetic clay liner (GCL), installation of dual-side-textured 60-mil HDPE geomembrane, and termination of the GCL and geomembrane in anchor trenches to be excavated and backfilled by others. The Contractor shall be responsible for the Bid Alternates (A and B), which include options for both supply and installation of all geosynthetic materials (A Option), as well as an install-only (B Option). In addition, an alternative bid item (C Option) is included that consists of installation and/or supply and installation of a geocomposite drainage layer as an alternative to the current design which includes a 0.5-ft. sand drainage blanket to be placed over the geomembrane liner on the bottom sections of the cell. Excavation and soil fill of the Cell 6 expansion to required subgrades, as well as all earthworks, will be performed by others. Unloading and initial staging of GCL and HDPE will be performed by Owner. The Geosynthetics Contractor shall manage and handle the rolls of GCL and HDPE material during the geosynthetics installation process, including staging near the construction area, if needed, and transport into the Invitation to Bid-Cell 6 Chaffee County Landfill Page 2 of 4 placement area and place the materials, so that no rolls are damaged due to weather or environmental conditions. Geosynthetics Contractor is to cause to manufacture and purchase the materials meeting project requirements following approval of the materials by AEC, ensure all manufacturers testing is conducted in accordance with the plans and forwarded to AEC for review, transport the materials to the landfill following review of test data and approval to ship by AEC. The GCL and HDPE liners will be installed concurrently so that no GCL is left exposed overnight. Provide other services as described and requested, including placement and field testing required by the approved CQA Plan included with this RFP. All work shall be done in accordance with this Request for Proposal, the project construction drawings and specifications, description of pay items, and the approved CQA Plan that will be provided as part of the project bid package document set. Bonding Requirements - Performance Bond 100 % Job Location Chaffee County, Colorado Questions are submitted online No Questions regarding this RFP's specifications/design/technical issues should be directed to the Engineer at: American Environmental Consulting, LLC 8191 Southpark Lane, Unit 103 Littleton, Colorado 80120 Attn: Mark McMullen - Design and CQA Project Manager 303-489-3971 mobile mmcmullen@aecdenver.com
Award
Municipal
$340,531.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 10, 2022
September 19, 2022
Multiple Locations, Salida, CO
Related To This Project
Salida, CO
Bid Date: Aug 08 2022
Salida, CO
Bid Date: Sep 15 2022
Salida, CO
Bid Date: Jan 31 2023
Salida, CO
Bid Date: Feb 14 2023
Salida, CO
Bid Date: Apr 20 2023
Salida, CO
Bid Date: Apr 25 2023
Salida, CO
Bid Date: May 05 2023
Salida, CO
Bid Date: Jul 27 2022
Salida, CO
Bid Date: May 24 2022
Salida, CO
--
Salida, CO
Bid Date: Jan 14 2021
Salida, CO
Bid Date: May 11 2021
Salida, CO
Bid Date: Apr 29 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.