EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 24, 2022 at 8:00 PM

Updated October 1, 2024

Site work and renovation of a water / sewer project in Mahomet, Illinois. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Mahomet Pump Station is located off of Lake of the Woods Road behind the Village of Mahomet Parks & Recreation Building General improvements of the existing Mahomet Pump Station which includes: Updating Electrical and Controls Equipment Replacing Pumps Replacing Piping and Valving inside the Existing Vaults Questions regarding the bid documents should be directed to Donohue & Associates, Inc., Attention: Alexis Sheehan, PE. (Phone: 217-903-4438, email: asheehan@donohue-associates.com) The Contractor and subcontractors shall conform to the "Public Works Preference" Act (30 ILCS 560/1 et. Seq.). The Contractor shall also comply with the Illinois Prevailing Wage Act, the Veteran's Preference Act, the Employment of Illinois Workers on Public Works Act, and the Illinois Human Rights Act. WAGE RATES: The Sangamon Valley Public Water District has established the rates for the various classifications of workers and crafters on the proposed improvements, with said rates being as required by the Illinois Department of Labor for the county within which the work will be performed. A copy of the applicable wage rates for the area in which the work is to be completed is included in the Project Manual. The CONTRACTOR and all subcontractors shall pay wages to laborers and mechanics at a rate not less than the minimum wages specified in the Prevailing Wage Determination issued by the Illinois Department of Labor. In addition, CONTRACTOR shall provide certified payroll on a monthly basis and retain said payroll records for not less than three (3) years after the OWNER has made final payment on the project. BID SECURITY: Bid Security in the amount of not less than 5% of the Bid shall accompany each Bid in accordance with the Instructions to Bidders. CONTRACT SECURITY: The Bidder to whom a Contract is awarded shall furnish a Performance Bond and a Payment Bond each in an amount equal to the Contract Price. BID REJECTION/ACCEPTANCE: The Owner reserves the right to reject any and all Bids, waive informalities in bidding, or to accept the Bid or Bids, which best serves the interests of the Owner. BID WITHDRAWAL: No Bid shall be withdrawn for a period of 60 days after the scheduled opening of the bids without the consent of Owner.

Bid Results

Water / Sewer

$240,000.00

Public - County

Renovation, Site Work

20

24

6

8

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Construction Progress Documentation, Construction Progress Schedule, Photographic Documentation, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Quality Control, Testing Laboratory Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Maintenance Data, Bonds, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Ceilings, Acoustical Ceilings, Flooring, Carpeting
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Facility Electrical Power Generating and Storing Equipment, Power Filters and Conditioners, Capacitors, Transfer Switches, Automatic Transfer Switches
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
60
Bidding Soon
517
All Active Projects
259
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2022

September 19, 2022

img_map_placeholder

S Lake of the Woods Rd, Mahomet, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Mahomet Pump Station Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.