BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Kings Mountain, North Carolina. Completed plans call for the renovation of a educational facility.

**As of October 12, 2022. The Project has been awarded to Beam Construction but no awarded amount available as of yet.** Bids will be received for a single prime - all categories. The proposal shall be lump sum. 1. Provide a new air conditioning system for the main building and main gymnasium. The main system type will be dual temperature fan coil units with dedicated outside air. Secondary system types will include roof and pad mounted Dx equipment. 2. Remove all existing building automation and replace. 3. Project shall be phased per documents and bid with base and alternates as listed in project manual. All Base Bid and Alternate Costs shall account for escalation through end of project. 4. The contractor shall provide all temporary construction barriers and maintain egress paths shown. 5. Provide all associated electrical work to accommodate the upgrades to the mechanical systems. 6. Provide all associated work to integrate existing HVAC equipment with the new BAS. 7. All permit costs are to be paid by Contractor and included in the Bid/Alternate costs. All contractors are hereby notified that they must have proper license as required under the state laws governing their respective trades. Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company, insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal, or in lieu thereof a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute the contract in accordance with the bid bond. Said deposit shall be retained by the owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten days after the award or to give satisfactory surety as required by law. A performance bond and a payment bond will be required for one hundred percent (100%) of the contract price for all contracts. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 60 days without written consent of owner. The owner reserves the right to reject any or all bids and to waive informalities.

Award

Educational

$190,000.00

Public - County

Renovation

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
77
Bidding Soon
1,162
All Active Projects
486
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 20, 2022

October 19, 2022

img_map_placeholder

500 Phifer Rd, Kings Mountain, NC

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.