BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Junction City, Kansas. Completed plans call for the renovation of a military facility.

The Milford Lake Project has a need for metal roof overlays on two (2) existing shower houses with traditional shingles. Curtis Creek Shower House - remove abandoned solar panels and piping, removing (2) inside tanks, replace existing skylights, patch roof damage if needed, replace the fascia boards, and the complete installation of the metal roofing overlay. West Rolling Hills Shower House - replace existing skylights, patch roof damage if needed, replace the fascia boards, and the complete installation of the metal roofing overlay. The Contractor shall provide all equipment, labor, supervision, and material necessary to complete the project. SUBMISSION OF PROPOSALS AND PROPOSAL OPENING: Due to the COVID-19 Global Pandemic, the Government is taking precautions to ensure the safety and health of all Contractors and Government employees. Electronic proposals are REQUIRED. Mailed and hand-delivered proposals are NOT ALLOWED. The Contractor is required to ensure that the proposal package is legible and complete. To submit your proposal electronically, email your proposal to Contract Specialist Adam Haley (Adam.J.Haley@usace.army.mil) and Contracting Officer Joshua M. Higginbotham (joshua.m.higginbotham@usace.army.mil). Keep in mind that due to email safeguards and the size of your proposal package, emails may not be received immediately by the Government; therefore, make sure to email proposal packages at least an hour before the proposal opening time specified in the solicitation to ensure there was adequate time to receive proposals. If proposal packages are not received by the Government recipient by the date and time specified, it may be considered late. Refer to FAR 52.214-7 for how late proposal packages are handled. Between $100,000 and $250,000 SITE VISIT (CONSTRUCTION) (FEB 1995) - ALTERNATE I (FEB 1995) (a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed. (b) An organized site visit has been scheduled for-- Tuesday, September 13, 2022 at 9:00AM CST (c) Participants will meet at-- Milford Project Office, 5203 N Hwy K-57, Junction City, Kansas. We will then travel over to the Shower House at West Rolling Hills, then to Curtis Creek. SUBMISSION REQUIREMENTS Offers are due no later than the date specified in BOX 13 A. Offers shall be submitted via e-mail to sole attention of adam.j.haley@usace.army.mil and Joshua.M.Higginbotham@usace.army.mil on the attached solicitation. All text must be legible and easily read. If you have any questions or issues in submitting your quote electronically, coordinate with Adam Haley immediately at (816) 389-3143. The final date to submit questions is five (5) days prior to the solicitation closing. All questions shall be submitted in writing to the sole attention of Adam Haley at adam.j.haley@usace.army.mil All offers must be good for atleast 90 days from the offer due date. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$250,000.00

Public - Federal

Renovation

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
13
Bidding Soon
213
All Active Projects
91
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2022

October 26, 2022

img_map_placeholder

Multiple Locations, Junction City, KS

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.