BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 3, 2022 at 8:00 PM

Updated January 27, 2024

Site work for a civil project in Chesapeake, Virginia. Completed plans call for site work for a water / sewer project.

Raw Water Facilities Red Top to Lake Gaston Water Treatment Plant Section D (Station 136+59 to Station 210+00) The Work under this Project consists of the furnishing materials and installation of approximately 7,341 linear feet of 36-inch IPS DR17 high density polyethylene (HDPE) raw water main pipe and appurtenances generally parallel to Route 58 between Wilroy Road and Nansemond Parkway. The Work also includes approximately 251 linear feet of bore and jack installation of three 48 steel casings and wetland restoration. This project is Section D of the total water main project. The work shall include all pipe, valves, air release valves, and related appurtenances. Existing sections were installed by others and the extent of the previous work is shown on the drawings. The contractor shall connect the Section D water main to the previously installed Section C and the HDD crossing of the Nansemond River.

Award

Water / Sewer

$8,181,902.00

Public - City

Site Work

25

11

9

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
65
Bidding Soon
1,018
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2022

November 9, 2022

Project location map

US-58, Chesapeake, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.