BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 26, 2022 at 8:00 PM

Updated October 24, 2023

Site work and paving for a mixed-use development in Winfield, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

TID 9 Business Park Hotel Infrastructure Reedsburg, Wisconsin Sealed Bids for the construction of the following: Project No. 220187 TID 9 Business Park Hotel Infrastructure includes: The construction of Skinner Road to include the extension of water main, sewer, and storm sewer from Golf Course Road easterly approximately 580 LF. The project also includes grading, base course, asphalt pavement, curb and gutter, restoration of the work area, and other miscellaneous items in conformance with the Contract Documents. Bid Bond equal to five percent (5%) of the Bid payable to the OWNER. All Bids uploaded and submitted through Quest shall also be accompanied with Bid Form 00 41 43. Please make your check payable to Vierbicher and send it to 400 Viking Drive, Reedsburg, WI 53959. Please contact us at 608-524-6468 if you have any questions. The CONTRACTOR shall be required to pay not less than the minimum wage rate as established by law. The City of Reedsburg reserves the right to waive any informalities and to reject any or all Bids. The letting of the work described herein is subject to the provisions of Sections 62.15, 66.0901 and 66.0903, Wisconsin Statutes.

Award

Roads / Highways

$292,379.00

Public - City

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
242
Active Projects
132
Bidding Soon
866
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2022

September 30, 2022

Project location map

Skinner Rd, Winfield, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.