Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in Dillingham, Alaska. Completed plans call for site work for a water / sewer project.
Install residential well in Dillingham Alaska. The magnitude of construction is: $25,000 to $100,000 . Period of Performance: 08/24/2022 to 10/31/2022 The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises BACKGROUND A. The Togiak NWR has a residential well that needs to be installed for a small residence in Dillingham Alaska. This will require disconnection from existing water line and installing a new well in accordance with State of Alaska BMPs B. Disconnect the existing water line from Residence, drill, install and seal new well for the residence. 2.0 SCOPE OF WORK 2.1. Base Requirements 2.1.1. Line Item 01 - Well Installation A. Disconnect and abandon in place the existing well supply line to Residence 1 in Dillingham Alaska. Water supply line should run as indicated on the Drawings. B. Provide new potable drinking private well and well casing to supply to Residence 1. Provide disinfection and sealing as required by the State of Alaska. Installation shall follow the State of Alaska Department of Environmental Conservation Drinking Water Program, Best Management Practices for Construction of Non-Public Water Wells, Current Edition (June 2016) C. Well Installer shall have a minimum of 5 years of installing Water Wells in the Area of Dillingham Alaska or be a Certified Well Driller in good Standing with the Alaska Water Well Association (AWWA). D. Secure local City of Dillingham Permits for installation of Well. E. Secure ADEC Permits F. Deliverables: (i) Documentation of installation of previous wells in Dillingham or Certification of Membership with the AWWA (ii) Work plan, meeting the State of Alaska BMPs (iii) Completed Permits (iv) Well Logs Option Line Item 02 - Water Supply Line Installation A. Provide new, minimum, 2" HDPE supply line, dependent to meet water flow requirements, from installed well to Residence entrance. Abandon in place existing water line. See BMPs and Task Order for Water well capping. See Page 6 for Typical Detail of Trench Section. B. Replace all disturbed areas with new material, topsoil, seeding as required. C. Deliverables: (i) Submittals for all materials to be installed. 2.3. Additional Requirements 2.3.1. Period of Performance A. Work shall be completed 90 days after receipt of Notice to Proceed. 2.3.2. Well Specifications A. Specification 33 21 00 shall be met in addition to the Task 1 Requirements 3.0 SUPPLEMENTARY INFORMATION 3.1. Project Location & Availability 3.1.1. Project Location A. Project is located in the City Limits of Dillingham, Alaska as shown on Map. B. Residence 1 New Water Well is accessible via road 3.1.2. Work Hours: A. Normal work hours at the station are 7:30am to 4:00pm, Monday through Friday, excluding Holidays. Coordinate with staff if access to the site is required. B. Additional hours outside normal work hours may be requested and are subject to approval by Station staff and the Contracting Officer. 3.1.3. Staging Area A. Staging Area is located as approved by the local USFWS staff *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Water / Sewer
$100,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 16, 2022
September 19, 2022
To Be Determined, Dillingham, AK
Related To This Project
Dillingham, AK
--
Dillingham, AK
Bid Date: Mar 31 2022
Dillingham, AK
Bid Date: Jan 19 2023
Kodiak, AK
Bid Date: Sep 14 2022
Nenana, AK
Bid Date: Sep 08 2022
Kodiak, AK
Bid Date: Sep 15 2022
Kodiak, AK
Bid Date: Sep 16 2022
Anchorage, AK
--
Noorvik, AK
Bid Date: Sep 06 2022
Sand Point, AK
Bid Date: Aug 16 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.